Laserfiche WebLink
. • e , <br /> • <br /> -._ »- _... ..... -.-.>- ._...•.+gra= �'rs4cccrasvc^:^, n..:�^ �^... a.�..rir.:c...... ._:.^. ..a rr- :^_st;.r:. :A.ss - �ra •:n 7.—..::<.. <br /> WHAT'S UP (OR DOWN) IN DOWNTOWN AND THE CAPITOL AREA, <br /> Alternatives for LRT in a tunnel will ` 1-T. ► , ,v.t. ii=j: - .11 Witill— - - <br /> be studied for comparison to street ar�'�i' I, ' ��' �•. � � = <br /> level alignments in both Downtown • , .. 1 -i1 <br /> St. Paul and the Capitol Area as the I <br /> Midway Corridor project continues. ' r <br /> Because of the recommendations to "' Ire �' "� r , <br /> study tunnels by the City of St. Paul ... 4 <br /> and Capitol Area Architectural and 'tfr a • .:-. <br /> Planning Board, Ramsey County -"+1 f f ems-- ° I '; ' "' "' <br /> Regional Railroad'Authority agreed = *:. !i, - ., <br /> to initiate tunnel studies in these 4 <br /> u <br /> areas now that preliminary , C? ef• <br /> •information from the analysis of r <br /> surface alignments has been _. P rte "' ' { <br /> completed. 0 <br /> ^fir .r - <br /> 'This study should not be 4:,-,..-t:-1;:`-1... .-- .,,,, <br /> interpreted as an endorsement of , ,. � . ,: r: ...i- .. • -,,„•;„$-: -, <br /> tunnels in St. Paul,"said John T. A comparison of tunnel to surface LRT alignments in Downtown St.Paul will be <br /> Finley, Chairman of Ramsey County completed in Fall 1990. <br /> Regional Railroad Authority. "I <br /> believe LRT on the streets of potential locations for tunnel Capitol Area alternatives is <br /> Downtown St. Paul would enhance alignments for engineering feasibility important to ensure that possible <br /> its vitality and could be constructed and service characteristics in order tunneVsurface combinations in each <br /> at much lower cost. We will conduct to identify a preferred tunnel area are compatible. <br /> ate studies requested,comparing alignment for each of the areas <br /> nderground to street-level LRT, so (Downtown and Capitol). The tunnel information will be <br /> additional information can be reviewed by the Capitol Area <br /> obtained to answer the questions Simultaneously,the street-level Architectural and Planning Board <br /> some still have on this topic." alignments will be analyzed further members and by the Downtown <br /> to reaffirm or designate a preferred Task Force.Three St. Paul City <br /> Separate, but parallel studies, of the alignment in each area on the Councilmembers and two Ramsey <br /> surface alternatives and the tunnel surface.The next steps will evaluate County Regional-Railroad Authority <br /> alternatives will be conducted the preferred tunnel alignment in Commissioners have joined the <br /> independently in downtown and the relation to the preferred surface LRT Downtown Task Force,so that they <br /> Capitol Area.The first step in the alignment of each area. will be able to follow the tunnel study <br /> tunnel study will consider all the Coordination of the downtown and information more closely. p <br /> t _v t .# %, v-4-,--...4,,,,;4,.. ;,,-,-..-i14-..,-.•-4-4.--4- -dsz <br /> NORTHEAST <br /> ... 4, ;,� �-• CORRIDOR TASK FORCE <br /> =t .°..00i <br /> " BEGINS WORK# 1 <br /> .,2„,,_ '• .m The importance of community <br /> involvement was emphasized by <br /> '11111111111a,�„ Duane McCarty, Vice Chairman of <br /> I ' "" Ramsey County Regional Railroad <br /> of' .40011111111Authority(RCRRA) at the first <br /> meeting of the Northeast Corridor <br /> i Task Force (NECTF) on July 9. In <br /> .h,,,.$.7-„c:7".-4,...,,!_ his charge to the task force he said, <br /> Downtown Task Force Members review information on LRT in Downtown St.Paul--at "Each member of this task force has <br /> the table are Doug Hoskins,Alan K. Ruvelson,Jr,Bob Bach, Chair of the Downtown (Continued on Page 4) <br /> Task Force and Gary Grefenberg. <br />