Laserfiche WebLink
RESOLUTION NO. 3056 • <br /> PAGE SIX <br /> (b) equipment over 100,000 BTU $35 . 00 plus <br /> hour capacity ( 12,000 $2 .00 per <br /> per ton) 100,000 BTU per <br /> hour or <br /> fraction <br /> thereof over <br /> 100,000 BTU per <br /> hour capacity <br /> 4 . Signs, Billboards . (no surcharge) <br /> (a) signs up to 100 square feet $25 .00 plus <br /> $5 .00 per 25 <br /> square feet or <br /> fraction <br /> thereof <br /> (b) signs 100 square feet $50.00 plus <br /> and over $10.00 per 100 <br /> square feet or <br /> fraction • <br /> thereof <br /> 5 . Heating and Ventilation Work. <br /> (a) gas, oil burner equipment $25. 00 plus <br /> $5.00 per <br /> 100,000 BTU per <br /> hour or <br /> fraction <br /> thereof over <br /> 100,000 BTU per <br /> hour input <br /> (b) gravity warm air heating $35.00 per <br /> installation <br /> repair, <br /> alteration or <br /> extension <br /> (c) mechanical warm air heating $25 . 00 plus <br /> $5.00 per <br /> 100,000 BTU per <br /> hour or <br /> fraction <br /> thereof over • <br /> 200,000 BT per <br /> hour input <br /> capacity <br />