My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1990/04/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1990
>
Agenda Packets - 1990/04/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:21 PM
Creation date
7/25/2018 6:34:50 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/9/1990
Supplemental fields
City Council Document Type
City Council Packets
Date
4/9/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMO TO: Mayor and City Council t\ia4/1 C' <br /> • FROM: Public Works Foreman Ulrich <br /> DATE: April 5, 1990 <br /> SUBJECT: Additional Work Needed to Groveland Lift Station <br /> To refresh your memory, the work on Groveland lift sta- <br /> tion which was awarded on November 9, 1989, is about to <br /> commence. This work was to replace both pumps and two valves. <br /> Since that time we have experienced some problems with the <br /> check valves in the system. They are sticking open and allow- <br /> ing flow to return to the wet well, thus pumping the same <br /> material many times. We have consulted with Waldor about this <br /> and have concluded that these valves should be replaced. <br /> There are a couple of other modifications to the plumbing of <br /> these valves and pumps that would update this lift station, <br /> thus eliminating maintenance of the valves installed. <br /> Being this is a generalized line item in the budget, <br /> (pump and motor, ect. ) , we are requesting approval to so the <br /> work at this time. Since general tear down and shut down of <br /> this facility is necessary to do the pump work, it would be <br /> cost effective to replace the additional valves at this time. <br /> • We feel it would be less complicated and time consuming if <br /> Waldar, the original company awarded the bid, did the neces- <br /> sary additions. The maximum amount needed for approval of the <br /> additional work is $3,444.00. This amount may be less costly <br /> if less labor is needed. <br /> We are planning to replace the control panel and float <br /> system in the near future, you will be hearing about that <br /> shortly. With the completion of this work, we will have a <br /> more efficient, easily maintainable lift station for years to <br /> come. <br /> STAFF RECOMMENDATION: Approve additional repair work at <br /> Groveland lift station and grant Waldor Pump the work re- <br /> quested for $3,444.00 to be charged to account 730-4122-515. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.