Laserfiche WebLink
MAY-10-1990 13:53 FROM SEH INC. TO 7S434E2 P.03 <br /> • <br /> Mr. Ric Minetor <br /> May 10, 1990 <br /> Page #2 <br /> 7. We will forecast traffic volumes from the Blaine Industrial <br /> Park and obtain traffic forecasts for Janes Field. We will <br /> use Mn/DOT data for traffic volume forecasts outside these <br /> areas. <br /> • <br /> 8. We will assign future traffic volumes to street systems <br /> under five scenarios. The scenarios include the following: <br /> A. Existing road system. <br /> B. Future road system with both the connection between <br /> existing and future County Road J and the Blaine <br /> Industrial Park and Airport Road. <br /> C. Future road system with a connection between existing <br /> and future County Road J. <br /> D. Future road system with a connection between the Blaine <br /> Industrial Park and Airport Road. • <br /> E. Future road system without either connection. <br /> 9 . We will analyze the impact of the traffic volumes under the <br /> four scenarios of the future road system. <br /> 10. We will provide an afternoon/evening (2:00 p.m. to 8:00 <br /> p.m. ) to meet individually with citizens to listen to their <br /> concerns. This will be dons early in the project schedule <br /> so that the work program can be modified as necessary to <br /> respond to citizens questions and concerns. <br /> 11 . We will mail letters with a return mail postcard/ <br /> questionnaire to the registered owners of the vehicles which <br /> we have identified at the nine license plate check <br /> locations. We will compile the data and tabulate the <br /> information received by the return postcards. <br /> 12. We will make three presentations to the City Council. The <br /> first will be based on the results of our traffic studies of <br /> existing traffic. The second will indicate cur traffic <br /> forecasts and traffic assignments based on the four future <br /> scenarios. The third will be a final report at a public <br /> meeting designed for public input. <br /> These steps are outlined in more detail in our proposal . S <br />