Laserfiche WebLink
PROCEDURE FOR AMENDMENT <br /> Procedures for the amendment of the Silver View Park Master Plan is as follows: <br /> III1. The Park and Recreation Commission must review any amendment to the plan. <br /> 2. The Council upon recommendation from the Parks and Recreation Commission <br /> will review the amendment. <br /> 3. A public hearing must be held. <br /> 4. Final approval by simple majority of the Council must be given by resolution. <br /> The criteria of any amendment is that it follows the concept plan described in this <br /> plan. <br /> AMPHITHEATER <br /> Provisions for the re-sloping of the amphitheater will be made as funds and manpower <br /> are available. <br /> Two smaller bridges or culverts are suggested for the nature path located in the gully <br /> area off of the Silver Lake Road access and the area along Long Lake Road near the <br /> Scotland Green parking lot. <br /> • PARK MAINTENANCE PROPOSAL <br /> It was affirmed by the Silver View Task Force Committee that the maintenance <br /> expectation of Silver View Park exceeds the present capabilities of the City. The Task <br /> Force does not recommend lowering the expectation, but instead makes a <br /> recommendation to the City Council to hire a seasonal employee from May until <br /> September for the purpose of performing park maintenance at Silver View Park. <br /> Duties would include pathway maintenance, pond buffer area trimming, litter pick-up, <br /> basketball court, raking the sand volleyball court and inspection of equipment and <br /> facilities. This maintenance employee, if headquartered at the picnic shelter, could <br /> house equipment and supplies in the storage room. <br /> SPRINKLING SYSTEM EXPANSION <br /> For future turf maintenance and park beautification, it is important to water the grass <br /> to ensure grass growth. The sprinkling system mechanics are already installed <br /> including a pump and electrical timer. The system was specified with the capabilities <br /> and expectations for future expansion to the soccer field and picnic shelter area. The <br /> expansion cost would simply be additional pipe, sprinkler heads and installation labor. <br /> 4 <br />