• Mounds View Planning Commission April 1, 1998 <br /> Regular Meeting Page 13 <br /> The floor was returned to the Commission for questions and comments. <br /> Commissioner Johnston asked staff if the MnDOT approval of the associated traffic <br /> signal depends on the realignment of Edgewood Road and if so how close would the <br /> realignment come to City Hall. <br /> Director Jopke told the Commission the realignment of Edgewood Road is part of the <br /> project at this point in time. He gave no specific plan dimensions. <br /> The floor was turned over to the applicant for his presentation. <br /> Wendell Smith showed the Commission an updated artistic rendering of the proposed <br /> facilities. He told the Commission that the contractor for the project has been selected. <br /> The changes that have been made from the original site, and as presented by Director <br /> Jopke, were reviewed. No access on to County Road H2 or Long Lake Road has been <br /> designed into the project. This design element was a direct result of working with the <br /> neighborhood that had made it known from early on in the project that they did not want <br /> the theater to impact the traffic going through their neighborhood. <br /> • The Fire Marshal's request to widen the facility entries will be accommodated. These plan <br /> changes will be made available at the next Planning Commission meeting. <br /> Several of the Commissioners expressed their concern that the City has not been given <br /> formal notice from MnDOT that the traffic intersections involved with the project have <br /> been approved for construction. They requested that the applicant furnish an official <br /> notification from MnDOT at the April 15, 1998 Planning Commission meeting. <br /> The current plan shows a sidewalk coming from Long Lake Road to the facility entrance <br /> an• a so -rom ong a e ov- • -'. ••. • : . •••. • • - . -- - • <br /> would prefer to eliminate the sidewalk from Long Lake Road to the facility entrance and <br /> have a bituminous path instead. This change will be shown on all future drawings. <br /> A site-drainage overview was given by Brian Mundstock, of SEI, the consulting <br /> engineering company for the project. <br /> Motion/Second: Brasaemle/Stevenson to continue the Planning Commission regular meeting of <br /> April 1, 1998 beyond the 11:00 p.m. cutoff point. <br /> Ayes - 6 Nays - 0 <br /> 4111 The motion carried. <br />