My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-1992
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1992
>
03-18-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2018 10:15:03 AM
Creation date
7/27/2018 10:12:22 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
3/18/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- -- --- ..........u:.aa�. vi Lv.. 3 ox 1ocxs 2 and ? <br /> and Lot 1 of Block 4. These lots are located almost entirely in existing <br /> II wetland. <br /> with reepect to dredging, 3arr's standard of measurement is that the <br /> dredged area must be no larger than necessary to meet the applicant's <br /> objectives . In this cave, we believe the objective of dredging is to off- <br /> set water quality enhancement and stormwater storage values lost as a <br /> result of disturbances associated with the proposed development. The <br /> applicant has (has not) demonstrated that the proposed plan replaces • <br /> stormwater storage on a one-to-one basis. This meets the minimumnnecessary <br /> standard. The applicant. has also demonstrated that the water quality <br /> enhancement values of the wetland will be (will not be) enhanced if the <br /> proposed dredging plan is adopted. This indicates that moreCjtegp.the <br /> minimum amount of necessary dredging is proposed. The impacts of increased <br /> dredging to improve water quality enhancement values of the wetland must be <br /> weighed against the disadvantages of disturbance prior to permitting the <br /> proposed plan. <br /> IP <br /> STANDARD: S. Work shall not be performed during waterfowl breeding and <br /> fish spawning seasons. <br /> COMPLIANCE STATUS: The proposed construction schedule does not comply with this <br /> standard. The applicant should be encouraged to schedule Phase 1 work <br /> during winter mmnths (November to February) . <br /> • <br /> STANDARD' 9. On-land or in-ground waste disposal shall be greater than <br /> 100 feet from the wetland. <br /> COMPLIMCE STATUS: On-land and in-ground waste disposal has not been proposed. <br /> S A A.KT.J: 10. Solid and/or hazardous waste shall not be disposed of to the <br /> wetland. <br /> COMPLIANCE STATUS: Solid and hazardous waste disposal to the wetland has not <br /> 4110 <br /> 1:? cal pz: mcia, ono f A mi <br />
The URL can be used to link to this page
Your browser does not support the video tag.