Laserfiche WebLink
• Land Allocation and Coverage Calculations <br /> Multi-Tech Existing Site: <br /> Approximate Site Area 247,518 <br /> Building Footprint Area 52 , 156 <br /> Building to Land Coverage 21% <br /> Parking and Drive Area 114 , 016 <br /> (46%) <br /> Surfaced Area of Site 166 , 172 <br /> ( 67%) <br /> Open Space and Green Area 81, 346 <br /> (33%) <br /> Multi-Tech Site with Addition: <br /> 411 Site Area ( same) 247 ,518 <br /> Building Footprint Area <br /> Addition Footprint 17,480 <br /> Total Building Footprint 69,436 <br /> Building to Land Coverage 28% <br /> Parking and Drive Areas Added 17 , 650 <br /> Total Parking and Drive Area 114 , 186 <br /> (46%) <br /> Surfaced Area of Site 183, 622 <br /> ( 74%) <br /> Open Space and Green Area 63 , 846 <br /> (26%) <br /> Phasing Schedule <br /> The Multi-Tech Systems expansion project is proposed for <br /> construction commencing spring, 1994 , as soon as necessary <br /> project approvals can be obtained, with completion by fall, <br /> 1994 . <br />