Laserfiche WebLink
06-30-1995 10:24 784 31.1.4 MOUNOSVIEW — PUBLIC WORKS P.05 <br /> 06.'30.'95 11:nts FAX 5E3 ST. PAUL 411003r003 <br /> • <br /> _Asa; <br /> MEMORANDUM <br /> 1 St. Paul, Mn O Minneapolis. MN O St Cloud, MN CI Chippewa Falls, WI O Madison, WI <br /> TO: Rocky Keehn,P.E. <br /> FROM: Kelly Bettendorf <br /> DATE: June 29, 1995 <br /> RE: City of Mounds View <br /> Watson Investments Real Estate Purchase Agreement <br /> The purchase agreement between Watson Investments, Inc. and the City of Mounds View includes <br /> a statement that Outlot A of the North Star Industrial Park,2nd Addition,will be conveyed to the <br /> • City and that a storm water detention pond will be constructed on Outlot A at the Seller's expense. <br /> Oudot A is nearly all wetland habitat and wetland permits will be required for the construction of <br /> a storm water detention pond. The agreement between Watson and the City was signed after the <br /> permanent WCA program was effective, therefore, the terms of the agreement are subject to the <br /> existing WCA rules. <br /> The Wetland Conservation Act of 1991 (WCA) does not restrict excavation within wetlands, it only <br /> regulates draining and filling. However,the WCA does regulate the discharge of fill if excavated <br /> material is placed within the wetland boundary,Any fill placed within the wetland boundary would <br /> require replacement at a 2:1 ratio. <br /> The US.Army Corps of Engineers does regulate excavation within wetlands, therefore a 404 permit <br /> would be required.Wetland mitigation would be required for the area of excavation, as well as the <br /> area of fill at a minimum ratio of 1:1, depending upon the probability of success of the replacement <br /> wetland. If the area is less than 0.5 acre, a nationwide permit could be requested without any <br /> proposed mitigation. <br /> • <br />