Laserfiche WebLink
MEMORANDUM <br /> TO: PLANNING COMMISSION <br /> FROM: JOYCE PRUITT, PLANNING ASSOCIATE <br /> DATE: Janaury 31, 1996 <br /> SUBJECT: CHURCH UPON THE ROCK, 7901 RED OAK DRIVE, EXTENSION OF <br /> A CONDITIONAL USE PERMIT TO ALLOW FOR THE CONTINUED <br /> USE OFA TEMPORARY STRUCTURE ON RESIDENTIALLY ZONED <br /> PROPERTY, PLANNING CASE NO. 436-95 <br /> Church Upon the Rock, 7901 Road Oak Drive, has made application for an extension of a <br /> previously approved Conditional Use Permit to allow for the continued use of a temporary <br /> accessory structure. In April, 1988, the City Council approved Resolution No. 2320 for a <br /> temporary classroom structure. The Resolution allowed use of the temporary structure for a <br /> five-year period from the date of adoption. A sunset clause requiring removal of the temporary <br /> structure and placement of a permanent structure in its place and a contingency requiring the site <br /> and building to be brought up to code after the five-year time period were included in Resolution <br /> No. 2320. <br /> At this time, the applicant is requesting that an additional extension of two (2)years be granted <br /> to allow more time for the Church to assess its needs and options in relation to the site. The <br /> applicant's extension request is based on complications caused by the inability of Church Upon <br /> the Rock and Northside Christian School to move into the Rice Creek Center in New Brighton. <br /> It seems more effort has been placed on finding an appropriate purchaser than <br /> relocating the Church and the School. <br /> Building Inspector, Rick Jarson, and I inspected the temporary structure on January 8, 1996. Our <br /> inspections revealed the classrooms were regulated at 70 degrees and the staff noted that air <br /> conditioning is provided in the summer. Fire extinguishers and alarms were provided as well. <br /> Eighteen student desks were in one room and sixteen desks were in the second room. A missing <br /> spindle was found on the stairway leading into the 7th graders classroom and Mr. Jarson noted <br /> that the stairs were too narrow for the entryway. <br /> Church Upon the Rock has reported that two classes, composed of 7th and 8th graders, utilize the <br /> temporary structure for classrooms. The classes include 15-17 students each and are used from <br /> approximately 9:20 a.m. to 3:40 p.m. Staff at Church Upon the Rock noted that each temporary <br /> structure is 24'x 24' in size. <br /> A summary of action taken and application materials submitted for this item were provided in the <br /> • last packet. If you require copies of any of the materials or have any questions, please do not <br /> hesitate to call. <br />