My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-1996
MoundsView
>
City Commissions
>
Planning & Zoning
>
Packets
>
1990-1999
>
1996
>
04-17-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 3:17:42 PM
Creation date
7/31/2018 7:42:21 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
4/17/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> Dear Planning Commission: • <br /> We would like to add a canopy with 15 lites on the property we own at 280 W. Cty. Rd. I. The <br /> reason we would like to do this is, one, to provide weather protection to our customers, two, to <br /> provide security to them at night with much better lighting when they are fueling their <br /> automobiles. The canopy needs to be put in the location chosen because it would be positioned <br /> directly in front of the building for easier customer access to the building and better site lines for <br /> the employees working. <br /> At the same time we would also like to remove the existing underground tanks and product <br /> piping, and replace them with new tanks and fiberglass piping. The island will be replaced <br /> with 3 new ones, 2 with gasoline equipment. All the asphalt will be replaced and all concrete <br /> • above tanks and gasoline fueling area will be new. A new sidewalk in front of the building will be <br /> put in with handicap ramps. The existing building will stay the same with a remodel of the <br /> interior and exterior. <br /> The existing recovery system that is on the property is going to be replaced with a new system <br /> called sparging. We are having the property anaylized by Dahl&Asssoc. to submit to the the <br /> Minnesota Pollution Control Agency some soil results so that they can officially authorized this <br /> system. The sparging system should shorten the clean up time down to one to two years. The <br /> present system could take from 8 to 10 years. Attached is a letter from Dahl &Assoc. outlining <br /> what we are planning to do. This system would be put in place during the remodeling of the <br /> location. <br /> Thank You. <br /> Tom Manke <br /> Leon Theis <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.