Laserfiche WebLink
16 <br />• Repaired aprox. 25 MXU’s and 35 MIU’s <br /> <br />Miscellaneous <br />• State samples (Fluoride) <br />• Bill Hanggi attended Rural Water School <br />• Mike Schnur began attending the John Thom Water School <br /> <br />Well # 3 <br />• Replenished oil in the automatic air oiler <br />• Replaced door alarm sensor <br />• Hawkins rebuilt SO2 cylinder unit <br />• Replaced re-circulator pump on furnace <br />• Cleaned the reclaim tank <br />• Re-built 3 Cl2 roto-meters <br />• Well was pulled by E. H. Renner for service <br /> <br />Well # 5 <br />• Replaced exterior incandescent bulbs with new fluorescent bulbs <br />• Well was pulled by E. H. Renner for service <br /> <br />Well # 6 <br />• Scrubbed entire plant, (tanks, pipes, and floor) <br />• Refurbished Cl2 monitor (new motor, and copper electrode) <br />• Replaced furnace mercury switch <br /> <br />Booster Station <br />• Replaced leaking coolant line for bearing packing pump #2 <br /> <br /> <br />Sewer Department <br />First Quarter Report <br />2005 <br />• Snow and Ice Control as necessary <br />• Removed snow out of the parking lots from City facilities <br />• Cleaned 4.6 miles of sanitary sewer <br />• Maintained pumps at lift stations <br />• Moved office furniture in City Hall <br />• Maintained the Vactor <br />• Continuing education to maintain various departmental licenses <br />• Maintained plowing vehicles <br />• Cleaned catch basins <br />• Assisted Water Department with meter repairs <br />• On-going cleaning of the Public Works shop <br />• Cleaned of the Lift Stations <br />• Inspected Sump Pumps