My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-1996
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1996
>
08-21-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 3:20:16 PM
Creation date
7/31/2018 1:54:05 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
8/21/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 2 • <br /> WIRELESS COMMUNICATIONS SYSTEMS COMPARISON CHART <br /> Technology: I Cellular J ESMR ' PCS <br /> • <br /> Service: • 2-way mobile voice communication • 2-way mobile voice . • 2-way mobile voice communication <br /> • Paging communication • 2-way paging/short message service <br /> • Voicemail • Paging • Facsimile <br /> • E-Mail • Dispatching • E-Mail <br /> • CDPD(Cellular Digital Packet Data) • Data Transmission • Video telecommunications <br /> • Conference calling • Data transmission <br /> • Facsimile • Voice mail <br /> •Data transmission • Conference calling <br /> Carriers in San Diego • GTE Mobilnet(formerly U.S. • Nextel Proadband: <br /> region: West) •Pacific Bell Mobile Services <br /> • AirTouch •Cox Communications <br /> Narrowband: <br /> • <br /> •Various Possibilities <br /> Number of carriers Two Unrestricted - • 2 broadband <br /> allowed by FCC in • 6 national narrowband <br /> San Diego region: • 6 regional narrowband <br /> • In future,several Metropolitan <br /> Trading Areas(MTAs)and Basic <br /> Trading Areas(BTAs) <br /> (See Appendix 3 for details) <br /> Spectrum: UHF 800-900 MHz(45 MHz band UHF 800 MHz(buying UHF 900 MHz, <br /> divided into 832 channels with 416 private licenses at various Microwave 1850-2200 MHz lei <br /> channels per provider) frequencies to assemble <br /> network) <br /> Signal: Analog,converting to digital Digital Digital <br /> Cell structures: Combination of lattice towers,mono- Combination of lattice Combination of monopoles,building- <br /> poles.and building-attached facilities towers,monopoles,and attached facilities,and fiber-based <br /> building-attached facilities microcells <br /> What drives new siting • Fill gaps in existing system • Fill gaps in existing system • Fulfill requirements by FCC to <br /> needs: • Improve call quality • Expand coverage areas serve 37.5%of market within 5 <br /> • Increase calling capacity • Increase calling capacity years of receiving license and 75% <br /> of market within 10 years of <br /> receiving Iicense <br /> Number of permit • AirTouch: approx.35 Nextel:between 25 and 35 • Pacific Bell Mobile Services: <br /> likely to be processed • GTE Mobilnet between 20 and 40 between 35 and 45 <br /> in 1996 in San Diego • Cox Communications:To be <br /> region:* determined <br /> Status: Existing,mature;still infilling and Existing,continuing to New,service beginning 1 -3 years in <br /> expanding. consolidate private licenses future. <br /> into networks. <br /> *Note: The number of permits likely to be processed in 1996 in the San Diego region is unpredictable for each of the technologies for <br /> various reasons. The numbers listed are estimates only. Market demand and the continuing development of the technology will <br /> affect the final numbers. Additionally, unexpected events (such as earthquakes and other natural disasters) could also in <br /> demand for wireless communications,and lead to the need for additional capacity sites. The numbers supplied in the chart also <br /> subject to change if leases cannot be obtained or permits are not granted. The figures are flexible and should not be taken as"fac• . <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.