Laserfiche WebLink
Mounds View Planning Commission August 7, 1996 <br /> • Regular Meeting Page 5 <br /> traffic studies, but reminded the residents that <br /> this facility would mainly be used only on <br /> Sundays. <br /> Commissioner Brasaemle inquired if the <br /> building would be one-story. Mr. Diem <br /> indicated that the facility would be first-floor at <br /> grade and a basement for a total of 2,002 <br /> square feet. Mr. Diem at this time showed the <br /> plans to the residents. <br /> Some of the drainage concerns were <br /> discussed, mainly the flow of drainage on the <br /> site. The applicant assured the Commission <br /> and the resident that he had been in contact <br /> with Rice Creek Watershed District and noted <br /> that there is currently a filtration system in <br /> 4111 place along County Road H. Some residents <br /> were still concerned with the water flowing to <br /> the north. Mr. Diem assured the residents that <br /> all water would drain to a gravel bed to the <br /> south. <br /> Steve Borden, 3009 County Road H, addressed <br /> the Planning Commission expressing his <br /> concern regarding drainage of the property. He <br /> asked if additional water would be draining to <br /> County Road H. Mr. Diem indicated that they <br /> are proposing a retention area and there is the <br /> availability of berms, curb cuts, etc. to slow the <br /> water down. He also indicated that more water <br /> would be flowing, however, the volume would <br /> be controlled. He also indicated that they will <br /> try to provide more green space and are <br /> proposing a massive green space on the <br /> southwest corner of the property and will <br /> address any aesthetic issues. <br /> Barb Cloues, 2875 County Road H, asked why <br /> the church would be allowed in an R-1 District. <br /> The Planning Commission responded by <br />