My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-01-1998
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1998
>
04-01-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 6:31:26 AM
Creation date
8/1/2018 6:31:10 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
4/1/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission Report <br /> Bridges Technology Park Phase II <br /> Planning Case 514-98 • <br /> March 27, 1998 <br /> Page 2 <br /> Discussion: <br /> Dimensional Requirements: <br /> Required Provided Met? <br /> Lot Area: 1 acre 2.59 acres Yes <br /> Building Height: S 45 feet 18 feet Yes <br /> Building Elevation: z 901.6 feet 908.5 feet Yes <br /> Building Setbacks <br /> • Front (Coral Sea St.): 40 feet 40 feet Yes <br /> • Side 20 feet 70 feet Yes <br /> • Rear: 40 feet 160+feet Yes <br /> Parking Lot Setbacks <br /> • Front (Coral Sea St.): 40 feet 40 feet Yes <br /> • Side: 5 feet 5 feet Yes <br /> Drainage. Wetland Considerations and Wetland Alteration Permit: <br /> This lot was platted as part of the Northstar Industrial Park 2nd Addition. At the time of platting, • <br /> a comprehensive drainage plan was prepared which identified the ponding requirements for Lots <br /> 1, 2 and 3. The major wetland along the western boundary of these lots was also delineated at <br /> that time. The applicant is proposing a drainage system which coordinates with the earlier plan. <br /> There will be a storm drain at the rear of the building to capture the building a parking lot runoff, <br /> directing it to the existing stormwater retention/detention pond behind the existing building. The <br /> runoff in the front of the building will drain into a catch basin which is then directed to the City of <br /> Blaine's storm sewer under Coral Sea Street. <br /> Because work is being done within 100 feet of the wetland, the applicant will need to have a <br /> wetland buffer permit approved by the City. From the site plans, the new parking area will be <br /> eight feet from the delineated edge of the wetland, but will not encroach into the wetland. The <br /> existing building and parking lot come within 18 feet of the wetland, but no closer. The applicant <br /> will have prepared a revision to the site plan prior to the meeting of thee Planning Commission <br /> which shows where the 100-foot wetland buffer is, indicating the amount of impervious surface <br /> within the buffer. Rice Creek Watershed District has reviewed the applicant's drainage plans and <br /> has approved them pending payment of a cash surety and dedication of an easement area over the <br /> existing wetlands on site. <br /> Parking: <br /> The parking ratios as required in the City Code for office and warehouse uses are as follows: <br /> Office: 3 spaces plus 1 per 175 square feet of floor area <br /> • <br /> Warehouse: 8 spaces plus 1 per 500 square feet of floor area <br />
The URL can be used to link to this page
Your browser does not support the video tag.