Laserfiche WebLink
3. The site area has increased from 23.99 acres to 26.03 acres. <br /> 4. Impervious site area has decreased from 36.9 % of the site area to 35.7 %. Pervious <br /> area has increased from 63.1 % of the site area to 64.3 %. • <br /> 5. The northernmost and southernmost driveways on Highway 10 remain on the plan. <br /> 6. Sidewalks are shown along Highway 10 and along the northern edge of the wetland. <br /> 7. Trash enclosures are shown for each of the buildings. <br /> 8. The two NURP stormwater ponds have been replaced with one large pond. This is due <br /> to the fact that city stormwater from north and east of the site will be piped to the new <br /> pond to help alleviate existing stormwater problems in the area. <br /> 9. Snow storage areas are shown on the plan. <br /> 10. No access is shown to Long Lake Road as was encouraged as part of the general <br /> concept plan approval. <br /> 11. Deceleration lanes are shown on the plan. <br /> A detailed staff review of the plans and of the changes will be provided to the Planning <br /> Commission once all the comments have been received from the other agencies. <br /> Recommendation: <br /> As previously mentioned no action is required. Staff and the applicant will be present to discuss <br /> the project with the Planning Commission. Any questions and/or additional information needed <br /> should be identified. <br /> • <br /> N:\DATA\GROUPS\COMDEV\DEVCASES\471-97\517-98.PC 1 <br /> • <br /> 4 <br />