My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-1995
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
1990-1999
>
1995
>
09-28-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 6:19:11 AM
Creation date
8/1/2018 6:38:04 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
9/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• and future development of Highway 10 are as follows: <br /> "Goal #1: Improve the aesthetic appearance of Highway 10 in order to maintain a fully <br /> developed and occupied highway business corridor." <br /> "Goal #2: Increase vehicle and pedestrian accessibility to business along Highway 10." <br /> The 1994 Action Steps under these goals include the creation of a Highway 10 <br /> Redevelopment Task Force or related task force under the Economic Development Authority, <br /> which developed a draft plan for the redevelopment of Highway 10. An inventory of properties <br /> on Highway 10, noting zoning, current use, and property conditions was completed to evaluate <br /> long and short term uses and recommend changes along the corridor. Evaluation of a <br /> professional redevelopment consultant for Highway 10 Corridor Study and Plan Development has <br /> been discussed. The City has also received a grant for construction of pedestrian bridge over <br /> Highway 10 which would need to be incorporated into the future vision of Highway 10 Corridor. <br /> VI. PROPOSED PLAN <br /> • The Highway 10 subcommittee reviewed and gathered data from eight other cities on <br /> highway corridors. There were several common elements that were revealed in each communities <br /> redevelopment plan. <br /> • Development Areas. Each communities plan contains designated areas of development. These <br /> areas of development address desired use, current land use, zoning, landscaping, <br /> environmental engineering and how the development meets the vision for the community. <br /> • Since redevelopment usually requires drastic land use changes and numerous technical <br /> decisions, most community redevelopment plans were put together with the assistance of an <br /> outside consultant who specializes in corridor and downtown redevelopment and community <br /> consensus building. <br /> • Redevelopment is a long range plan that can take several years, requires substantial public <br /> assistance up front and presents many risks and rewards. Undoubtfully a successful <br /> redevelopment pian, once initiates, takes strong local leadership from Councils, Boards and <br /> Civic Groups. <br /> • In most communities there is always an element of resistance to change. Not all residents will <br /> agree with plans, especially when there could be significant impacts to peoples lives and <br />
The URL can be used to link to this page
Your browser does not support the video tag.