My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-1995
MoundsView
>
Commissions
>
Economic Development Commission
>
Agenda Packets
>
1990-1999
>
1995
>
09-28-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 6:19:11 AM
Creation date
8/1/2018 6:38:04 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
9/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Page No. of Pages <br /> PROPOSAL/SALES AGREEMENT ATTRTI, <br /> . ...• ., .:... :.,..._' Ian <br /> 7420 W.LAKE ST. • MINNEAPOLIS,MINNESOTA 55426 • (6121 933-7730 • FAX(612)933-7883 <br /> COMPANY PHONEDATE <br /> MR DONUT/MOUNDSVIEW 7846863 I 7117/95 <br /> STREET JOB NAME <br /> 2394 OLD HWY 10 DONUT CONNECTION <br /> CITY,STATE AND ZIP CODE JOB LOCATION <br /> MOUNDSVIEW MN SAME <br /> BUYER CONSULTANT JOB PHONE <br /> MIKE&DONNA AE HANSON <br /> We hereby submit specifications and estimates for: <br /> MANUFACTURE AND INSTALL ILLUMINATED AWNING PER ATTACHED SKETCHES. <br /> FABRIC:STARLITE BURGANDY OR TEAL ON TOP.WHITE WITH RASBERRY OR TEAL STRIPPING AND COPY ON BOTTOM <br /> , SECTION:TOTAL LENGTH 96 FT. 27'ON EAST SIDE,44'ON NORTH SIDE,25'ON WEST SIDE. TOTAL HEIGHT 5'TOTAL <br /> PROJECTION 24" WITH EGGCRATE BOTTOM. <br /> DOUBLE LAMP U.L.APPROVED FLUORESCENT FIXTURES WITH COLD WEATHER BALLASTS.MOUNTED TO THE FRAME AND �j <br /> . INSTALLED TH THE POINT OF ELECTRICAL HOOK-UP, • <br /> 5 y a,),1 c..—A, <br /> CONSTRUCTION:GAL.WELDED SQUARE METAL TUBING. L �_ f?�� " v <br /> TOTAL COST ON AWNING INSTALLED TO THE POINT OF ELECTRICAL HOOK-UP $11,328.00 f'/� <br /> d7c <br /> ACCENT TEAL NEON ON BOTH SIDES OF BLDG. 45FT.TOTAL $1125.00 INSTALLED. <br /> 5-26.c-1 PW CES,• <br /> BLE FACE 8'X10'MR.DONUT FACES ON PYLON SIGN. NEW FACE WITH GRAPHICS $2590.00 <br /> SH OLD FACES$2240.001 2'X10'DRIVE THRU PAN FACES NEW WITH GRAPHICS $896.00 <br /> 5'X18"FLAT FACE SIGN IN BACK $105.00 INSTALLATION OF PYLON AND OTHER SIGNS-,..$880.00 <br /> PERMIT:COST OF SIGN PERMITS NOT INCLUDED IN THIS QUOTE...SIGN PERMITS WILL BE OBTAINED BY ATTRACTA, <br /> TERMS:1/3 DOWN 1/3 UPON INSTALLATION BALANCE NET 30 DAYS FROM INSTALLATION. <br /> / <br /> We Propose hereby to furnish material and labor-complete in accordance with above specifications,for the sum of: <br /> dollars($ ). <br /> Payment to be made as follows: <br /> All material is guaranteed toc beor as to spec.All work to be completed in a substan- <br /> tialworkmanlike manner according to specifications submitted per standard prat- Authorize <br /> tices.Any alteration or deviation from above specifications involving extra costs will Signatur <br /> be executed only upon written orders,and will become an extra charge over and <br /> • the estimate. All agreements contingent upon strikes, accidents or delays Note:This proposal may be <br /> d our control.Owner to carry fire,tornado and other necessary Insurance.Our withdrawn by us if not accepted within days. <br /> 4 rs are fully covered by Workman's Compensation Insurance. <br /> Acceptance of Proposal - The above prices, <br /> specifications and conditions(SEE REVERSE SIDE)are satisfactory and <br /> are hereby accepted. You are authorized to do the work as specified. <br /> Payment will be made as outlined above. Signature <br /> Date of Acceptance: Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.