My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-1998
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1998
>
04-15-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 6:47:06 AM
Creation date
8/1/2018 6:45:28 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
4/15/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br /> i <br /> Planning Commission Report <br /> Bridges Technology Park Phase II <br /> Planning Case 514-98 <br /> March 27, 1998 <br /> Page 2 <br /> Discussion: <br /> Previously: <br /> This request was discussed at the Planning commission's last meeting on April 1, 1998. <br /> According to the site plan dated 3/6/98, all of the dimensional requirements for this development <br /> would be met with the exception of the parking requirements, which will be discussed further <br /> below. One of the primary issues that was raised at the last meeting concerned how close the <br /> paved area was to the delineated wetland. It was requested that the distance between the wetland <br /> and pavement be increased to a minimum of ten feet. The revised plan(date-stamped 4/8/98) <br /> submitted by the applicant shows a setback of ten feet while maintaining a minimum 26-foot <br /> drive-aisle behind the building, as recommended by the Fire Marshal. <br /> Drainage. Wetland Considerations and Wetland Alteration Permit: <br /> As discussed at the last meeting, because work is being done within 100 feet of the wetland, the <br /> applicant will need to have a wetland buffer permit approved by the City. From the revised site <br /> plans, the new parking area and drive-aisles will be a minimum of ten feet from the delineated <br /> edge of the wetland. The revised site plan shows the 100-foot wetland buffer, the edge of the <br /> easement area, and statistics regarding the area of the buffer and the percent of which is covered • <br /> in pervious and impervious surface. <br /> Parking: <br /> The applicant has provided a master site plan for both lots 2 and 3 showing the parking for the <br /> existing and proposed buildings. Altogether, a total of 200 spaces would be required for both <br /> buildings, with a total of only 162 stalls being provided. The remaining 38 stalls are indicated as <br /> "proof of parking" on the master site plan. The proof of parking can be allowed one of two ways. <br /> For the ncighboring ZEP manufacturing, the pro: - .•. - _ • • •. - • • • • - • - Sig <br /> and warehouse parking ratios on the condition that the spaces be constructed if needed in the <br /> future. The Code, in Section 1121.14, requires that a conditional use permit be obtained for any <br /> reduction in parking space requirements. Obviously, a variance to the parking ratios would be the <br /> more expedient solution, if that choice is still an option considering the what the Code requires. <br /> If a variance to the parking requirements were considered, the following amended ratios would <br /> closely match with the number of stalls being provided: <br /> Office: 3 spaces plus 1 per 200 square feet of floor area=3 + 84 = 87 <br /> Warehouse: 8 spaces plus 1 per 750 square feet of floor area= 8 + 65 = <br /> .160 • <br /> The difference between the number of stalls provided (162) and the number required (200)would <br /> need to be shown as future parking(38). <br />
The URL can be used to link to this page
Your browser does not support the video tag.