My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-1998
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1998
>
04-15-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 6:47:06 AM
Creation date
8/1/2018 6:45:28 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
4/15/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Mounds View Planning Commission April 1, 1998 <br /> Regular Meeting Page 13 <br /> The floor was returned to the Commission for questions and comments. <br /> Commissioner Johnston asked staff if the MnDOT approval of the associated traffic <br /> signal depends on the realignment of Edgewood Road and if so how close 461.ld the <br /> realignment come to City Hall. <br /> Director Jopke told the Commission the realignme dge e: is part of the <br /> project at this point in time. He gave no specific vr dimensio <br /> The floor w <br /> as turned over to the applicant for esent #�� '�r<� • j= ;N:< <br /> Wendell Smith showed the Commission an upda' a r: ' rendering of the proposed <br /> facilities. He told the Commission that the contr.. oject has been selected. <br /> WhpThe changes that have been made from the • 1 site, ana , $ted by Director <br /> Jopke, were reviewed. No access on to ,an > s d H2 or vg"g-- ake Road has been <br /> designed into the project. This desi:a - en' Y. . a ect re of working with the <br /> neighborhood that had made it kn:,r from eat a' ject that they did not want <br /> the theater to impact the traffic 4!.ng throe `.their , .rhood. <br /> The Fire Marshal's reques :4 aK dent cility en ' s will be accommodated. These plan <br /> changes will be made ay. $ e at th-:•$ Plan =1. Commission meeting. <br /> S• '; . f the C1,—*!9;' a.12,ner expr: ..‘111::1 °1-concern that the City has not been given <br /> allsiOtiiiiha.ce fro = $' s at the tra- c intersections involved with the project have <br /> bee fd for co " • #`. They requested that the applicant furnish an official <br /> notifica �g <br /> Crtaii ril 15, 1998 Planning Commission meeting. <br /> Theta` ent p f ; � a sidewalk coming from Long Lake Road to the facility entrance <br /> • om 6+ w, i : a ver o -'g way I a wou a connec . • ee s hat they <br /> ould prefer to elide the Long Lake Road to the facility entrance sidewalk and have a <br /> 41e- Ar <br /> bituminous path Instead. This change will be shown on all future drawings. <br /> •, <br /> :. A site-drainag overview was given by Brian Mundstock, of SEI, the consulting <br /> " ~ - a •inee a a> 6mpany for the project. <br /> o ti":•::<° d: Brasaemle/Stevenson to continue the Planning Commission regular meeting of <br /> April 1, 1998 beyond the 11:00 p.m. cutoff point. <br /> Ayes - 6 .Nays - 0 <br /> • The motion carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.