My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-1996
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
1990-1999
>
1996
>
08-22-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:49:22 PM
Creation date
8/1/2018 6:48:03 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Packets
Date
8/22/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WHAT IS A REDEVELOPMENT DISTRICT ? <br /> A. Qualifying <br /> parcels consisting of 70% of the area of the TIF District <br /> are occupied by buildings, streets, utilities, or other <br /> improvements, and more than 50% of the buildings (excluding <br /> outbuildings) are structurally substandard to a degree <br /> requiring substantial renovation or clearance; <br /> OR <br /> parcels consisting of vacant, unused, underused, <br /> inappropriately used, or infrequently used rail yards, rail <br /> storage facilities o; excessive or vacated railroad rights- <br /> of-way. <br /> ights- <br /> of-way. <br /> To be considered" improved" , at least 15% of a parcel' s area <br /> must contain improvements . <br /> A building is "structurally substandard" if there are <br /> defects in structural elements or a combination of <br /> deficiencies in essential utilities and facilities, light <br /> and ventilation, fire protection including adequate egress, <br /> layout and condition of interior partitions, or similar <br /> factors . <br /> A building is not substandard if it complies with the <br /> building code or could be brought up to code at a cost of 4110 <br /> less than 15% of the cost of a comparable new building on <br /> that site. <br /> B . TIF Expenditures <br /> - land acquisition <br /> - demolition <br /> - clearing land <br /> - installation of utilities, roads, sidewalks, and <br /> parking facilities <br /> - administrative costs <br /> C. Duration <br /> 25 years from receipt of the first tax increment <br /> D. Pooling - 25% <br /> E . LGA/HACA Election - 5 . 0% <br /> 411 <br /> CASSERLY MOLZAHN & ASSOCIATES, INC. 6/10/96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.