My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-1997
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
1990-1999
>
1997
>
03-27-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 12:42:26 PM
Creation date
8/1/2018 6:55:59 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Packets
Date
3/27/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Community Business Survey <br /> Part I -Manufacturing Supplement �5�.�% /) <br /> 38. Please indicate the raw material forms that you use: (circle yes or no for each response) (f <br /> A. Rods, Wires Yes No <br /> B. Filaments, Rovings Yes No <br /> C. Ingots, Scrap - Yes No ill <br /> D. Tubing, Pipe Yes No <br /> E. Bars, Flats, Plate Yes No <br /> F. Sheets, Coils Yes No <br /> G. Rolled Shapes Yes No <br /> H. Castings, Molded Parts Yes No <br /> • I. Forgings . Yes No <br /> J. Extrusions Yes No <br /> K. Granules, Powders, Resins Yes No <br /> L. Other (Specify) Yes No <br /> 39. Please indicate the basic shapes you produce: (circle yes or no for each response) <br /> A. Prismatic Yes No <br /> B. Rotational Yes No <br /> C. Columnar Yes No <br /> D. Sheet Yes No <br /> E. Wire Forms Yes No <br /> F. Other (Specify) Yes No <br /> 40. Please indicate any advanced technology that you either are currently using or have future plans to <br /> . acquire: (circle all that apply) <br /> Fully <br /> - Implemented In Process <br /> and of Need Not <br /> Producing Implementing Information Interested <br /> A. CAD- Computer Aided Design 1 2 3 4 <br /> B. CAM-Computer Aided Manufacturing 1 2 3 4 <br /> C. MRP, MRP II, etc.) 1 2 3 4 <br /> D. Scheduling, Production Management <br /> Control Systems 1 2 3 4 <br /> E. Office Automation-Office Computerization. 1 2 3 4 <br /> F. SPC-Statistical Process Control 1 2 3 4 <br /> G. SQC-Statistical Quality Control 1 2 3 4 <br /> H. SPS-Statistical Problem Solving, Using <br /> Charts/Graphs Taguchi Methods 1 2 3 4 <br /> I. Local Area Networks-Computer LAIN 1 2 3 4 <br /> J. Automated Inspection-Computerized 1 2 3 4 <br /> Inspection Control <br /> K. AMH-Automated Materials Handling 1 2 3 4 <br /> . . Robotics-Manufacturing Robotics 1 2 3 4 <br /> M. FMS-Flexible Manufacturing Systems 1 2 3 4 <br /> N. JIT-Just in Time 1 2 3 4 <br /> 41. In which industry groups are you involved? (circle all that apply) <br /> A. Local. 1 <br /> B. State 2 <br /> C. National 3 <br /> Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.