My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-1997
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
1990-1999
>
1997
>
07-24-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 12:42:26 PM
Creation date
8/1/2018 7:27:46 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Packets
Date
7/24/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PSm`12 Sheldon <br /> July 9, 1997 <br /> Page 2 <br /> 3. Based on our computer model and the information submitted by the developer, the 100-year <br /> highwater elevation for the pond is 908.2. This will flood most of the open area on the cast <br /> side of the site. <br /> Recommendation: The highwater elevation is acceptable since the flooding is infrequent and <br /> should not muse any damage to the surrounding vegetation. <br /> 4. It appears that grading is proposed to be completed outside of the property owned by the <br /> developer (as noted in your MEMO to me on July I). During a site visit with the developer <br /> they discussed the possibility of working with the property owner to the north to make sure they <br /> do not change the existing overflow conditions. <br /> Recommendation: The developer will need written approval from the owner to the north <br /> before they proceed. Other options include a storm sewer down the central drive from the low <br /> • area on the property north of the development or moving the far north drive to make sure the <br /> grading occurs on the developers property. <br /> The following table addresses your concerns listed in the MEMO sent to us on July 1, 1997. <br /> 411 Item from SEH comments <br /> your <br /> memorandum <br /> 1 Addressed by the developer when they added storm sewer beginning near the <br /> entrance to the development <br /> 2 Addressed by the developer when they added storm sewer beginning near the <br /> entrance to the development <br /> 3 Addressed as Item 2 above. Also,better use of the land is obtained by using <br /> multiple use detention areas (utilization of the proposed flood area for recreational <br /> use when its not raining)then a pond with unflooded upland surrounding it. <br /> 4 Item 4 above <br /> 5 Item 2 above <br /> RJKlrjkfMER <br /> • S:tdAMMANO WOCX gq Wrp <br />
The URL can be used to link to this page
Your browser does not support the video tag.