My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2004/08/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2004
>
Agenda Packets - 2004/08/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:28 PM
Creation date
8/1/2018 4:50:11 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/9/2004
Supplemental fields
City Council Document Type
City Council Packets
Date
8/9/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />ARTICLE TWO <br />CONSTRUCTION OF IMPROVEMENTS <br /> <br />2.01. Agreement to Construct Improvements. The Developer agrees to construct the <br />Improvements, including the grading, drainage, landscaping and other improvements <br />required by City ordinance for development of the Property. The Improvements are more <br />fully described in the site plans, preliminary plat and specifications approved by the City (the <br />"Plans"). A final copy of the Plans must be filed with the City prior to commencement of <br />construction of the Improvements. All labor and work performed by the Developer in <br />connection with construction of the Improvements will be done and performed in the best and <br />most worker-like manner and in strict conformance with the Plans. Any deviation from the <br />Plans must be approved in writing by the City. Construction of the Improvements shall be <br />completed no later as set forth in Section 2.04 of this Agreement. Prior to initiating <br />construction of the Improvements, the Developer shall hold a pre-construction meeting with <br />the City to review and resolve any issues involving the construction of the Improvements. <br /> <br />2.02. Obtaining Permits. The Developer shall obtain in a timely manner and pay for all <br />permits, licenses, and approvals required in connection with construction of the <br />Improvements, and all easements and licenses necessary for access to the Property and <br />construction of the Improvements. The Developer shall meet in a timely manner the <br />requirements of all applicable local, state, and federal laws and regulations which must be <br />met before the Improvements may be lawfully constructed. Specifically, prior to obtaining <br />any building permits or grading permits as required under this Section 2.02 or otherwise, the <br />Developer shall complete the following requirements: satisfy and comply with all City <br />Engineer requirements and conditions regarding the Plans; complete all requirements set <br />forth in Section 3.01 of this Agreement regarding the plat of Velmeir CVS Addition. <br /> <br />2.03. Staking, Surveying, and Inspections. The Developer must provide for all staking, <br />surveying and inspections for the Improvements in order to ensure that the completed <br />Improvements conform to the Plans. The City will provide for general inspection, at the <br />Developer’s expense, on a basis that it determines necessary and appropriate within its sole <br />discretion. The Developer must notify the City in advance of all tests to be performed <br />regarding the Improvements. <br /> <br />2.04. Time for Developer's Performance: General Provision. The Developer agrees that it <br />will commence work on the Improvements on or before August 31, 2004, and shall complete <br />the Improvements on or before August 31, 2005. In the event of a “phased” construction <br />schedule, each phase shall be subject to its own timeline based upon the date of issuance <br />of the building permit. The City may at its discretion extend the dates specified in this <br />Section 2.04 upon receipt of written notice from the Developer of the existence of causes <br />which will delay the completion of the Improvements if such causes are ones over which the <br />Developer has no control and which could not have been reasonably foreseen by the <br />Developer. If an extension of the date of completion of the Improvements is granted by the <br />City, the Developer must continue the performance bond required by this Agreement to cover <br />the work during the extension of time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.