My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2004/08/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2004
>
Agenda Packets - 2004/08/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:39 PM
Creation date
8/1/2018 4:59:41 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/23/2004
Supplemental fields
City Council Document Type
City Council Packets
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The proposed Groveland Park Building replacement project will follow the same set of plans and specification as the Hillview Park Building, with a few minor modifications as indicated in the section, “Scope of Services”. The Hillview Park Building plans and specifications are available to interested parties upon request. The plans are in an AutoCAD format. <br /> <br />II. Scope of Services <br /> <br />The City of Mounds View is requesting proposals from qualified <br />consultants to perform the following tasks related to the new park building <br />to replace the existing building at Groveland Park in Mounds View: <br /> <br /> <br />Task 1: Develop a Site Preparation Plan <br /> <br />A. Place City building removal specifications in project <br />specification book. <br />B. Indicate any tree or object removals <br /> <br /> <br />Task 2: Develop a Project Site Plan <br /> <br />A. Meet with Parks Supervisor to review project scope and <br />discuss proposed layout. <br />B. Conduct a topographic survey of building site <br />(approximately 200’ X 300’) using onsite hydrant as <br />benchmark and adjacent streets as horizontal control. <br />C. Plot survey data into a site base map to be used as a <br />background for the site plan. <br />D. Develop grading a plan with proposed building footprint <br />E. Develop a utility plan with proposed building footprint <br /> <br /> <br />Task 3: Develop Park Building Plans and Specifications <br /> <br />A. Utilize existing Hillview Park Building plans and <br />specifications. <br />B. Alter Hillview Plans as follows: <br />1. Create a straight wall on the porch side of the <br />building by eliminating jogs by the existing storage <br />area and women’s bathroom. <br />2. Reduce the size of the bathrooms to create space <br />next to the women’s bathroom for a new enclosed <br />storage space with lockable access door. <br />3. Add a wall separating the mechanical area from <br />the existing storage area. Change this storage to a <br />food serving area with a tub sink, microwave, <br />stainless steel countertop, and metal rollup <br />shutter.
The URL can be used to link to this page
Your browser does not support the video tag.