My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2004/09/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2004
>
Agenda Packets - 2004/09/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:13 PM
Creation date
8/1/2018 5:16:37 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/27/2004
Supplemental fields
City Council Document Type
City Council Packets
Date
9/27/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Exhibit A <br /> <br /> <br />September 16, 2004 <br />Ms. Barbara Matelsky <br />7830 Gloria Circle <br />Mounds View, MN 55112 <br /> <br />Dear Ms. Matelsky; <br />I am sending you this letter of understanding in an effort to address and <br />document your wishes to alter the plan and assessment role for the 2003 Street <br />Improvement Project. <br /> <br />Based on our telephone conversation yesterday, you were informed that the City <br />has an ordinance that allows for one curb cut per residential property. This <br />ordinance was adopted on January 22, 1979. <br /> <br />At this time, your property has two paved accesses; a horseshoe shaped <br />driveway connecting Hillview Road to Gloria Circle, and one non-paved access; <br />to an out building off of Hillview Road. <br /> <br />Based on the aforementioned City Ordinance, a curb cut will not be allowed for <br />access to the outbuilding located off of Hillview Road. It is my understanding that <br />because the ordinance does not allowed this, you are now requesting that your <br />existing paved access onto Hillview Road be eliminated as part of the 2003 <br />Street Improvement Project. <br /> <br />The City will remove the existing asphalt driveway onto Hillview Road by saw <br />cutting at or near the property line and removing the asphalt from that point to the <br />street. The City will add topsoil to this area and provide sod. A concrete barrier <br />curb will be placed along the entire length of Hillview Road adjacent to your <br />property. <br /> <br />Staff will then present a proposed revision to the assessment role for the 2003 <br />Street Improvement Project to the City Council to reduce your assessment by an <br />amount equal to the total cost to provide a second concrete apron. The proposed <br />revision will reduce the assessment of your property from the current amount of <br />$3,364.27 to the proposed revised amount of $2,475.59 ($888.68 dollar <br />reduction) <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.