My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-2012
MoundsView
>
Commissions
>
Economic Development Commission
>
Agenda Packets
>
2010-2019
>
2012
>
08-17-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2018 5:10:16 AM
Creation date
8/3/2018 5:09:59 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Council Packets
Date
8/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Premium Stop Redevelopment Area Study <br />8 City of Mounds View <br />Goal #4 <br />Use the urban design elements to create a streetscape system that emphasizes a sense of human scale <br />and balance between pedestrian and automobile space along County Road 10 and within the development. <br />Enhance pedestrian connections from the redevelopment site to the County Road 10 corridor and to <br />adjacent residential neighborhoods. <br />Goal #5 <br />Require new development to provide adequate and appropriately screened off-street parking. <br />Redevelopment Master Plan <br />The Premium Stop Redevelopment Area plan envisions the creation of a compact, walkable commercial node <br />with a mix of retail, office and housing. The development will connect to community amenities along County <br />Road 10 as well as existing adjacent neighborhoods, local parks and new multi-use trail, neighborhood schools <br />in the City, all while providing a pedestrian friendly environment. <br />The master plan proposes a development that will be tied together by a new multi-use trail along County Road <br />10 as well as a series of new pedestrian connections providing access to the redevelopment site and creating <br />a backbone for internal circulation. The proposed commercial properties that front County Road 10 will define <br />the edge of the corridor and provide necessary services to the neighborhood and community as a whole. The <br />commercial uses will be backed by a series of shared surface parking lots that will serve as parking for the <br />commercial and office uses, as well as provide overflow public parking during events and weekends. The <br />proposed housing within the redevelopment project site will include housing that blends with the traditional <br />surrounding neighborhoods providing affordable options for current residents and free up housing for new <br />residents. <br />As a direct result of conversations with City staff, a set of draft goals was created for the Premium Stop Gas <br />Station Area Redevelopment Plana and are listed below: <br /> <br />Goal #1 <br />Achieve an appropriate development project that includes business, residential and mixed uses along <br />County Road 10. The business/ commercial uses should frame the intersections and buffer the residential <br />uses from the impacts of County Road 10. The development should also be based on real market <br />conditions and achievable market strategies. <br />Goal #2 <br />Require the development to reflect and reinforce the positive and strong architectural elements that <br />represent the desired character and image of the community. The development should also be designed in <br />a manner to be compatible with adjacent developments. <br />Goal #3 <br />Extend the urban design elements and amenities found along the proposed County Road 10 multi-use trail, <br />demonstrating consistency and compatibility with the existing improvements found along the County Road <br />10 corridor and visually connecting the site to its surroundings.
The URL can be used to link to this page
Your browser does not support the video tag.