My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-2014
MoundsView
>
City Commissions
>
Economic Development Commission
>
Packets
>
2010-2019
>
2014
>
09-19-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2018 5:23:31 AM
Creation date
8/3/2018 5:23:31 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Council Packets
Date
9/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Economic Development Commission Meeting <br /> <br />September 22, 2014 <br /> <br />DEVELOPMENT UPDATES <br /> <br /> <br />Coventry (BelRae Senior Living) <br /> <br />Construction on the 99-unit, three story senior residential facility is well underway. They <br />are planned to be completed by March of 2015 although we understand some delays <br />have put them as much as a month behind schedule. You may have noticed a sign on <br />the site saying what the building is with a phone number; there are already some <br />reservations with deposits made. <br /> <br />Anna Place Subdivision <br /> <br />This is a five-lot major subdivision located at the southwest corner of Ardan Avenue and <br />Eastwood Road. The land will be subdivided from excess Abiding Savior Lutheran <br />Church parking lot and greenspace. Parking lot removals will be to be completed this <br />year, and the Church will reconstruct their parking lot either later this year or early next <br />year. The developer is “Kayak Builders”, and they are planning for new homes in the <br />$300,000 price range. (See attachment.) <br /> <br />BioLife Plasma Services <br /> <br />A longtime tenant in Building D of the “Mounds View Business Park North” on the north <br />side of County Road 10, BioLife for years has desired to expand the number of patients <br />served however a parking deficiency has prevented them from doing so. BioLife’s <br />parking problems have also caused trouble for other tenants in the same building. To <br />better serve their clients and grow their business, they will be constructing a new <br />building between the former Saturn dealership and Multi-Tech, on excess Multi-Tech <br />land. The new building will be about 17,000 square feet and the additional parking will <br />allow them to fully utilize the new space. There will be an excess parcel created with <br />the subdivision, so additional development fronting County Road H2 will be possible. <br />(See attachments.) <br /> <br />ProGuard Sports <br /> <br />ProGuard will be moving into the vacant space next to Allegiance Fitness, in Building “J” <br />of the “MoundsView Business Park South” located on the south side of County Road 10 <br />and Woodale Drive, in space formerly occupied by Medtronic. ProGuard bills itself as a <br />“leading manufacturer of sporting good accessories”. With the 11,400 square foot <br />ProGuard build-out, the building will be fully occupied. <br />
The URL can be used to link to this page
Your browser does not support the video tag.