Laserfiche WebLink
<br /> Beard Group, Inc. Page 21 <br />CONSTRUCTION FEATURES <br /> <br />Foundation <br />Cast in place foundation walls with post and beam support on spread footings <br /> <br />Flooring <br />Concrete decking with 3" topping at 1st floor; 24" floor joists with T&G sheeting, <br />acoustimat, and floating faux vinyl plank on floors 2, 3, & 4 <br /> <br />Construction <br />Underground is concrete, 1st-2nd-3rd-4th floors wood frame <br /> <br />Windows <br />Vinyl <br /> <br />Roof <br />Membrane with R50 Insulation <br /> <br />Exterior Walls <br />Rock-Face CMU, Brick, precast and resin/cement panels <br /> <br />Interior Walls <br />Flat and hand troweled finished sheet rock <br /> <br />HVAC <br />Electric and gas forced-air heating and cooling <br /> <br />Elevators <br />2 centrally located high-speed energy efficient elevator <br /> <br />Security <br />Electronically controlled key fob access and security cameras <br /> <br />Fire Protection <br />Sprinkler system <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />