My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2013
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2010-2019
>
2013
>
08-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:15:59 AM
Creation date
8/6/2018 6:46:21 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
8/12/2013
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
8/12/2013
EDA Document Type
Council Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />To: City of Mounds View <br />Attn: Heidi Steinmetz <br />Economic Development Specialist <br /> <br />Bid Date: August 6, 2013 <br /> <br />Project: Building Demolition and Site Restoration <br />2400 Co. Rd H2 / 2394 Co. Rd 10 Mounds View, MN <br />_____________________________________________________________________ ______ <br /> <br />Bolander submits pricing as follows: 2400 site $ 68,218.00 <br /> Sign Demo $ 750.00 <br /> 2394 Site $ 18,714.00 <br /> Sign Salvage $ 1,500.00 <br />___________________________________________________________________ ______ <br /> <br />Sections: E-mailed <br />Drawings: E-mailed <br />Addenda Acknowledged: None <br /> <br />Inclusions: <br /> <br />1. Erosion control and NPDES permit <br />2. Complete structure demolition and disposal <br />3. City wrecking permit. <br />4. Water and sewer removals and disconnects. <br />5. Environmental Surveys. <br />6. Remove and dispose of the existing regulated waste. <br />7. Remove and dispose of the existing asphalt and curb. <br />8. Import and place 4 inches of topsoil, and seed. <br /> <br />Exclusions: <br /> <br />1. Bond; add 1% If required <br />2. Testing, monitoring & inspections, survey, layout work <br />3. Engineering, design, preconstruction video and survey <br />4. Shoring, bracing, earth retention, underpinning <br />5. Asbestos/lead/chemicals/contaminated soils <br />6. Sealing of wells <br />7. Underground tanks <br />8. Removal or relocation of buried: debris, rubble, and/or obstructions not associated with the existing buildings <br />9. Dust/weather/safety barriers <br />10. Utility relocates/re-routes <br />11. Traffic control <br /> <br />This proposal is subject to review by Bolander in 30 days. <br /> <br />Thank you for the opportunity to bid this project. <br /> <br />Yours truly, <br /> Evan Mackey <br />Demolition Division Manager
The URL can be used to link to this page
Your browser does not support the video tag.