My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-2010
>
City Council
>
EDA
>
Packets
>
2010-2019
>
2010
>
11-22-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2018 8:30:12 AM
Creation date
8/6/2018 8:30:00 AM
Metadata
Fields
Template:
MV EDA
EDA Document Type
Council Packets
Date
11/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />General Home Repair <br />Page 3 of 3 <br />Application Process: Completed applications will be processed by the Housing <br />Resource Center (HRC) - NorthMetro on a first-come, first-served basis, as funds are <br />available until all program funds are committed. After loan approval you will be notified <br />to come to the HRC for a loan closing to sign a Note and Mortgage. <br /> <br />Rehabilitation Consulting: HRC consultants will be available to advise borrowers <br />about proposed projects and conduct an optional initial home inspection. HRC will <br />review bid(s) for reasonableness. <br /> <br />Loan Costs: A credit report fee paid by applicant at time of application; mortgage <br />registration tax and filing fee and title policy paid by borrower at closing. The title policy <br />may be financed through the loan. <br /> <br />Contractors & Permits: Contractors must be properly licensed by the state of <br />Minnesota when required. Permits must be obtained when required by city code. <br /> <br />Total Project Cost: It is the borrower’s responsibility to obtain the amount of funds <br />necessary to finance the entire cost of the work. If the final cost exceeds the loan <br />amount, the borrower must obtain the additional funds. Borrower’s contribution to <br />project cost must be paid prior to release of loan funds. HRC can direct borrowers to <br />additional financing sources. <br /> <br />Work Completion: Weather permitting, work must be completed within 120 days of <br />loan closing. <br /> <br />Disbursement Process: Loan funds will remain in escrow at GMHC until payment for <br />completed work. The following items must be received before the funds can be <br />released: <br /> 1. Final Invoice from each contractor showing all amounts paid and due. <br /> 2. Lien Waiver. Original from each contractor. <br /> 4. Completion Certificate signed by each contractor and the borrower. <br />5. Permits Closed. Have the inspector sign the permit card, or have the <br />inspector leave a message at the HRC (651) 228-1077. <br />6. Final Inspection and approval by the HRC. <br /> <br />It may take up to 10 business days after receipt of above items to prepare checks. <br />Payment checks to contractors must be countersigned by the borrower. Lien waivers <br />must be provided before the funds will be released. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.