My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-2006
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2000-2009
>
2006
>
05-22-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:15:28 AM
Creation date
8/6/2018 11:41:30 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
5/22/2006
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
5/22/2006
EDA Document Type
Council Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View EDA March 27, 2006 <br />Regular Meeting Page 4 <br /> <br />President Marty asked if the City could start the engineering to get this sound wall going. 130 <br />Director of Public Works Lee stated he recommends the City works with MnDOT to have 131 <br />MnDOT take the lead on this project, since it is a MnDOT wall on MnDOT property. He stated 132 <br />if MnDOT is unwilling, the City can step up and be the lead agency, but it makes sense to have 133 <br />MnDOT lead the project. 134 <br /> 135 <br />President Marty asked if MnDOT can be contacted once the resolution is passed, before MnDOT 136 <br />hauls out the fill from the golf course, to try and figure out where to put the fill. He suggested 137 <br />the earth and berm part would be filled in and the rest would be constructed as needed. 138 <br /> 139 <br />Director of Public Works Lee explained there will be a grading plan created as part of the project, 140 <br />and permits from Rice Creek Watershed will be required, as well as an erosion control plan. He 141 <br />stressed that the City needs to get going on this fairly quickly. 142 <br /> 143 <br />President Marty asked if the project can be done this year. Director of Public Works Lee stated it 144 <br />depends on discussions with MnDOT. He noted that MnDOT may not initiate the project until 145 <br />2007 or possibly in the fall of 2006. 146 <br /> 147 <br />President Marty noted there is a lot of fill coming out of the golf course area, and suggested it 148 <br />could be used before MnDOT pays to haul it out. 149 <br /> 150 <br />Director of Public Works Lee stated the quickest way to approach the project is to make it into 151 <br />two phases, where the first phase is grading to be done by the City, and the second phase is the 152 <br />construction of a wall by MnDOT after the fill material is set in place. 153 <br /> 154 <br />President Marty noted there have been talks about a wall for awhile, and he would like to see it 155 <br />get done. 156 <br /> 157 <br />Commissioner Gunn asked if there are preliminary plans for this project. Director of Public 158 <br />Works Lee stated there are no construction plans, but the feasibility report and cost estimates 159 <br />have been done. He noted this information was turned over to MnDOT. He noted the engineers 160 <br />for the company that worked on it are no longer with that company. 161 <br /> 162 <br />President Marty stated one concern is that MnDOT might forget about the $300,000, and stressed 163 <br />the City needs to jump on this to capture the whole $700,000, and contribute what the City needs 164 <br />to get the project going. 165 <br /> 166 <br />Director of Public Works Lee stated MnDOT has a noise wall construction program, so they are 167 <br />constructing walls every year. He noted it is easier to have MnDOT add into their program than 168 <br />to have the City take the lead. 169 <br /> 170 <br />Commissioner Thomas stated that there will be difficulty in getting these funds. She stated it has 171
The URL can be used to link to this page
Your browser does not support the video tag.