Mounds View EDA March 27, 2006 <br />Regular Meeting Page 4 <br /> <br />President Marty asked if the City could start the engineering to get this sound wall going. 130 <br />Director of Public Works Lee stated he recommends the City works with MnDOT to have 131 <br />MnDOT take the lead on this project, since it is a MnDOT wall on MnDOT property. He stated 132 <br />if MnDOT is unwilling, the City can step up and be the lead agency, but it makes sense to have 133 <br />MnDOT lead the project. 134 <br /> 135 <br />President Marty asked if MnDOT can be contacted once the resolution is passed, before MnDOT 136 <br />hauls out the fill from the golf course, to try and figure out where to put the fill. He suggested 137 <br />the earth and berm part would be filled in and the rest would be constructed as needed. 138 <br /> 139 <br />Director of Public Works Lee explained there will be a grading plan created as part of the project, 140 <br />and permits from Rice Creek Watershed will be required, as well as an erosion control plan. He 141 <br />stressed that the City needs to get going on this fairly quickly. 142 <br /> 143 <br />President Marty asked if the project can be done this year. Director of Public Works Lee stated it 144 <br />depends on discussions with MnDOT. He noted that MnDOT may not initiate the project until 145 <br />2007 or possibly in the fall of 2006. 146 <br /> 147 <br />President Marty noted there is a lot of fill coming out of the golf course area, and suggested it 148 <br />could be used before MnDOT pays to haul it out. 149 <br /> 150 <br />Director of Public Works Lee stated the quickest way to approach the project is to make it into 151 <br />two phases, where the first phase is grading to be done by the City, and the second phase is the 152 <br />construction of a wall by MnDOT after the fill material is set in place. 153 <br /> 154 <br />President Marty noted there have been talks about a wall for awhile, and he would like to see it 155 <br />get done. 156 <br /> 157 <br />Commissioner Gunn asked if there are preliminary plans for this project. Director of Public 158 <br />Works Lee stated there are no construction plans, but the feasibility report and cost estimates 159 <br />have been done. He noted this information was turned over to MnDOT. He noted the engineers 160 <br />for the company that worked on it are no longer with that company. 161 <br /> 162 <br />President Marty stated one concern is that MnDOT might forget about the $300,000, and stressed 163 <br />the City needs to jump on this to capture the whole $700,000, and contribute what the City needs 164 <br />to get the project going. 165 <br /> 166 <br />Director of Public Works Lee stated MnDOT has a noise wall construction program, so they are 167 <br />constructing walls every year. He noted it is easier to have MnDOT add into their program than 168 <br />to have the City take the lead. 169 <br /> 170 <br />Commissioner Thomas stated that there will be difficulty in getting these funds. She stated it has 171