Laserfiche WebLink
17 <br />PUBLIC WORKS 3rd QUARTER REPORT 2004 <br /> <br />Water Division <br />Third Quarter Report <br />2004 <br /> <br />Maintenance <br />• Pumped 66,631,000 gallons in July <br />• Pumped 62,011,000 gallons in August <br />• Pumped 50,868,000 gallons in September <br /> <br />Miscellaneous <br />• Had OSHA inspection <br />• State Fluoride sample <br />• State Nitrate samples <br />• Worked on bid specs for the pulling of wells 3 and 5 <br />• Worked on bid specs for the water service repair contract <br />• Held meeting on new SCADA system computer and software <br />• Turned water off and on for main work on 03 street project, and Hidden <br />Hollow project <br />• Assisted sewer department with lowering and raising of manholes and <br />valves on Silver Lake Rd overlay <br />• Inspected installation of water and sewer at new CVS building (tested <br />water as well) <br /> <br />Repairs <br />• Repaired / Raised Hydrants at 7729 Long Lake Rd. <br />• Repaired / Raised valve box number 59, 64, 83, 132, and 523 <br />• Just raised valve box number 13, 14, 23, 26, 34, 36, 45, 56, 60, 65, 70, <br />76, 78, 79, 83, 141, and 486 <br />• Lowered valve box number 599 <br />• Replaced 50-60 MXU batteries during sump pump inspection program <br />• Inspected and turned one third (1/3) of the City’s valves <br />• Replaced nut on valve at Edgewood and County Road H <br /> <br />Well # 1 <br />• Replaced broken belts on air compressor <br /> <br />Well # 3 (Treatment Plant #1) <br />• Replaced security system door magnet on SO2 door <br />• Cleaned the reclaim tank. <br />• Replaced 10” main line meter (spare in well No, 4) <br />• New landscaping around building <br />