Laserfiche WebLink
<br />LandCor Report <br />June 23, 2003 <br />Page 3 <br /> <br />6A. Garbage Enclosure <br /> <br />As shown on the site plan, the garbage enclosure would be located on the south side of the <br />property. No details were provided regarding the enclosure’s construction, however the PUD <br />indicates that the enclosure shall be of the same construction as the building with solid, <br />opaque, latching gates. The developer confirms that this is their intent. Chain link is not an <br />acceptable gate material. The details should be added to the final plan set provided to staff <br />upon City Council approval. The attached resolution includes this provision. <br /> <br />7A. Landscaping <br /> <br />A Landscaping Plan has been submitted with the plan set and the City Forester has had an <br />opportunity to review them. On May 19, 2003, the Forester approved the landscape plans, <br />commenting that the developers are making a significant investment into the landscaping <br />which will help blend this addition into the surrounding heavily wooded natural areas. Snow <br />storage areas are noted on the landscape plan to ensure that plowed snow will not damage <br />plantings. <br /> <br />8A. Signage <br /> <br />No sign plan has been submitted for the site however staff has communicated the PUD <br />requirements to LandCor representatives. While not specifically addressed, no pylon sign <br />will be allowed, as the intent of the PUD is to establish a consistent design theme throughout <br />the development, using similar construction, color and materials. The Theater sign has a <br />masonry, monument styled base and the same would be required on this site. <br /> <br />9A. Building Construction <br /> <br />As noted earlier, the proposed office building would be two stories with a 7,500 square-foot <br />footprint. The materials used would consist of a colored split face block base, brick, and a <br />upper level EFIS treatment. (EFIS is “Exterior Finish Insulation System”.) A colored <br />rendition has been provided for this building which is attached for the Council’s review. The <br />proposed colors are consistent with the Theater. A patio area is shown off the back of the <br />building. The building elevations are shown on plan sheet A100, however building heights <br />are not indicated. This information should be added to the final plan set provided to staff <br />upon City Council approval. The attached resolution includes this provision <br /> <br />