Laserfiche WebLink
11 <br /> <br />ROAD NAME CHANGE <br />At the April 8, Council Meeting, Council adopted a resolution renaming North County Line (old <br />County Road J) to Long Lake Road. A notice was published in the paper on April 18th. A thirty day <br />period is required before an ordinance becomes official. Arrangements were made to have the <br />new signs (Long Lake Road) installed during the week of May 20th. To provide a less confusing <br />transition, the new “Long Lake Road” name blades were installed and the old “North County Line <br />“ name blades were left in place. After a period of approximately 6 months, the old signs will be <br />removed. <br /> <br />FLOODING ON THE SIDE OF WALGREEN’S OVER THE NEW TRAIL <br />Staff has noticed that a portion of the new pedestrian pathway in front Walgreen’s and adjacent to <br />County Highway 10 has been under water after heavy rains. The flooding lasts for a day or two <br />until the surrounding soil can absorb the water. The question of why the storm water from the <br />wetland doesn’t drain into the pond has been asked. The reason for this is that the wetland and <br />the newly constructed pond are two separate water bodies; the wetland was never intended to <br />drain directly into the pond. Storm water from City Hall and the Walgreen’s site are designed to <br />discharge into the new pond for water quality treatment and storm water detention. <br /> <br />It was determined that the reason there is water flooding the pathway at various times is that the <br />trail was constructed on the natural grade in close proximity to the edge of the wetland. As the <br />wetland water elevation fluctuates, so does the possibility of the trail being under water. Over time <br />the portion of the trail that is affected may require repairs. At that time, staff would certainly <br />recommend that fill be utilized to raise the pathway to an elevation at or higher than the wetland’s <br />100 year high water level (the elevation that the wetland statistically would reach once every 100 <br />years). Staff will continue to monitor this situation and the condition of the pathway. <br /> <br />FIRE CONTROL PANEL <br />The fire control panel for City Hall was previously approved for replacement after ground fault <br />problems caused the panel to fail. The panel monitors all smoke and fire detection sensors. After <br />replacement of the panel, the contractor noticed more ground fault errors on the panel. To avoid <br />ruining the new panel, the system was shut down until the ground fault could be found and <br />repaired. The contractor spent many hours tracking down the ground faults. After a couple of <br />days of research, it was called to Staff’s attention that all the wiring to the detection equipment <br />needed to be replaced. The contractor noted that the original installation of the wire was not done <br />properly and it would cost too much to track down the numerous bare wire locations. The <br />contractor was instructed to stop work and asked to submit an estimate of the cost to replace all <br />wiring to the detection equipment. At this time, Staff is waiting for the estimate. <br /> <br /> <br />PUBLIC WORKS DEPARTMENT GOALS <br /> <br />PUBLIC WORK DEPARTMENT ANALYSIS AND REVIEW:To analyze the operations and <br />structure of the Public Works Department, to make it more efficient, to better serve the needs of <br />the citizens and businesses of Mounds View, and to better achieve the goals and objectives set <br />by the City Council. <br /> <br />CITY WIDE SURVEY <br /> <br />DEVELOP A FILING SYSTEM FOR PUBLIC WORKS <br /> <br />DEVELOP PROCEDURES <br /> <br />DEVELOP POLICIES <br />