Laserfiche WebLink
<br /> <br /> 5 <br /> <br /> <br /> <br /> <br />Fireplace (this is the estimated value) <br /> <br />Brick Single flue (flat value) <br /> <br />$2,400 <br /> <br />Brick Double (flat value) <br /> <br />$3,500 <br /> <br />Free Standing wood (flat value) <br /> <br />$1,200 <br /> <br />Heatilator gas <br /> <br />$2,400 <br /> <br />HVAC (Plus Surcharge) <br /> <br /> Air Conditioning: Residential <br /> <br />$20 plus $3.00 per ton or fraction thereof; plus $.50 <br />surcharge <br /> <br /> Air Conditioning: Commercial <br /> <br />1.5% of contract price plus surcharge at .0005 times <br />contract price <br /> <br /> Furnaces, Residential per unit, up <br /> to 4 units (includes air exchanger) <br /> <br />$25 plus $5 per 100,000 BTU per hour or a fraction <br />thereof, plus $.50 surcharge. $25 plus $5.00 per <br />100,000 BTU per hour or fraction thereof over <br />100,000 BTU per hours input capacity plus $.50 <br />surcharge <br /> <br />Furnaces, Commercial <br /> <br />1.5% of the contract price plus surcharge at .0005 <br />times contract price <br /> <br />Ventilation Systems <br /> <br />Residential <br /> <br />$10.00 for the first fan plus $4 for each additional fan. <br /> Fans less than 100 CFM - $5.00 for the first fan plus <br />$2.00 for each additional fan <br /> <br />Commercial <br /> <br />1.5% of contract price plus surcharge at .0005 times <br />contract price <br /> <br />Duct/Tin/Sheet Metal work (if not included in contract price above) <br /> <br />Residential <br /> <br />$25$20 <br /> <br />Commercial <br /> <br />21.5% of contract price plus surcharge at .0005 times <br />contract price <br /> <br />Gas fireplace <br /> <br />$25 includes incidental piping - plus $.50 surcharge <br /> <br />Mobile Homes (Chapter 1110)