My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-2007
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Minutes
>
2000-2009
>
2007
>
04-18-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:58:39 AM
Creation date
8/28/2018 6:18:43 AM
Metadata
Fields
Template:
MV Minutes
GOVBOARD
Planning Commission
DOCTYPE
minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View Planning Commission April 18, 2007 <br />Regular Meeting Page 2 <br />________________________________________________________________________ <br /> <br /> <br />4. Citizens Requests and Comments on Items Not on the Agenda <br /> <br />None. <br /> <br /> 5. Planning Cases <br /> <br />A. Planning Case DE2007-002: Application for a Development Review for an <br /> 11,000 square foot Manufacturing/Production Building <br /> <br />Planning Associate Heller reported Central Sandblasting, 2299 County Road H, would like to <br />build a new approximately 11,000 square foot building on the west side of their property. She <br />stated the expansion would increase the total building square footage by approximately 60 <br />percent and several new employees would be added. She stated the look of the building would <br />be similar to the current building. She commented clean up of the yard space has begun and <br />would continue in preparation for construction. <br /> <br />Planning Associate Heller stated the property is almost entirely either a gravel or asphalt surface, <br />which allows ample available parking space. The new building will have some additional <br />asphalt around it, with several additional designated parking spaces in the front. She reported <br />staff is confident that the site could support the building expansion in regards to parking, since <br />parking is available almost anywhere on site. <br /> <br />Planning Associate Heller stated setback requirements are met and a 30-foot easement currently <br />exists along the west property line. She commented Central Sandblasting proposes building a <br />driveway over the easement, which was approved by Public Works on the condition that the <br />applicant is aware the City is not responsible for repairs or replacement if for some reason it <br />would need to be accessed by the City. <br /> <br />Planning Associate Heller reported the applicant submitted an application to Rice Creek <br />Watershed District for the expansion, grading, and drainage plans. She stated the applicant has <br />received conditional approval from Rice Creek. She commented an acceptable storm water <br />drainage plan is a condition of the approval. She explained that a storm water pond built by the <br />City exists next to the building and Central Sandblasting had the foresight to buy into the pond a <br />few years ago. <br /> <br />Planning Associate Heller reported staff recommends approval. <br /> <br />Commissioner Walsh-Kaczmarek commented on point one of the resolution, which states the <br />applicant shall asphalt, sod, and landscape all disturbed areas. She asked if this applies to the <br />entire lot. <br /> <br />Planning Associate Heller stated the plan is to put some asphalt around the new building; <br />however, Rice Creek likes the pervious surface, so they will not be paving the entire site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.