Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />STAGE TWO OUTSIDE - to be accomplished between October 1993 and <br />December 1994. <br /> <br />1) <br />2) <br />3) <br />4) <br />5) <br />6) <br /> <br />new freestanding sign <br />flag pole on building <br />install flower beds (petunias) on boulevards <br />redesign and replace concrete apron <br />add new wheelchair access <br />install trees and flowers per the landscaping plan received <br />December 21, 1992 and referenced in the attached resolution as <br />Exhibit 2 <br /> <br />STAGE THREE INSIDE - to be accomplished in 1995. <br /> <br />1) complete purchase of new furnishings <br /> <br />STAGE THREE OUTSIDE - to be accomplished in 1995. <br /> <br />1) remove bituminous form north side of building and out back to <br />grass <br />2) resurface parking lot from rear of building forward excluding <br />rear lot <br />3) build airlock entry at building front <br />4) replace awning cover <br />5) install shrubs on north side of building (after bituminous is <br />removed), per the landscaping plan received December 21, 1992 <br />and referenced in the attached resolution as Exhibit 2 <br /> <br />All repairs and improvements to be in compliance with existing city <br />codes. Repairs to be performed by the owner or licensed contractors <br />when required. <br />