RESOLUTION 1071-17
<br />CITY OF MOUNDS VIEW
<br />COUNTY OF RAMSEY
<br />STATE OF MINNESOTA
<br />RESOLUTION RECOMMENDING APPROVAL OF A DEVELOPMENT REIVEW FOR
<br />ST. CLOUD INDUSTRIAL PRODUCTS, INC., FOR PROPERTY LOCATED AT 4821
<br />MUSTANG CIRCLE (PLANNING CASE MU2017-002)
<br />WHEREAS, the City of Mounds Municipal Code, Section 1006.06 (Development
<br />Controls) requires a Development Review of non-residential construction activity that increases
<br />the gross square footage of the principal building by more than ten percent (10%), or more than
<br />10,000 sq ft.; and,
<br />WHEREAS, St. Cloud Industrial Products, Inc., owner of North Central Bus and
<br />Equipment, Inc., and represented by Dean Wick (Outsource Architecture, LLC) has requested
<br />approval of a Development Review for property located at 4821 Mustang Cir. This property is
<br />legally described as:
<br />PID: 17-30-23-13-0008
<br />Lot 6, Block 1, Mounds View Industrial Park No. 3
<br />WHEREAS, the City of Mounds View Municipal Code, Section 1006.06, Subd 3
<br />(Development Plan) requires a review of plans for utility service, surface water drainage
<br />consistent with the most recently adopted Local Surface Water Management Plan subject to
<br />subsequent revisions, erosion and sediment control consistent with current City standards,
<br />streets, driveways, trails, parking, landscaping, screening and buffering, lighting, setbacks,
<br />exterior construction design and materials, trash disposal, construction timetable and such other
<br />matters as the Council may require; and,
<br />WHEREAS, the City of Mounds View Planning Commission has reviewed the
<br />documents listed below, finding them to be consistent with Section 1006.06, and other applicable
<br />sections of the Mounds View Municipal Code:
<br />Staff Report, dated June 7, 2017
<br />Applicant's Narrative, date stamped May 22, 2017
<br />Civil plans, p. 1 (Schultz Engineering & Site Design), dated May 4, 2017
<br />Site Plan, p. PIl (Outsource Architecture), date stamped May 30, 2017
<br />Architectural plans, p. A2.1, A3.1 (Outsource Architecture), dated May 12, 2017
<br />
|