Laserfiche WebLink
RESOLUTION 1071-17 <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br />RESOLUTION RECOMMENDING APPROVAL OF A DEVELOPMENT REIVEW FOR <br />ST. CLOUD INDUSTRIAL PRODUCTS, INC., FOR PROPERTY LOCATED AT 4821 <br />MUSTANG CIRCLE (PLANNING CASE MU2017-002) <br />WHEREAS, the City of Mounds Municipal Code, Section 1006.06 (Development <br />Controls) requires a Development Review of non-residential construction activity that increases <br />the gross square footage of the principal building by more than ten percent (10%), or more than <br />10,000 sq ft.; and, <br />WHEREAS, St. Cloud Industrial Products, Inc., owner of North Central Bus and <br />Equipment, Inc., and represented by Dean Wick (Outsource Architecture, LLC) has requested <br />approval of a Development Review for property located at 4821 Mustang Cir. This property is <br />legally described as: <br />PID: 17-30-23-13-0008 <br />Lot 6, Block 1, Mounds View Industrial Park No. 3 <br />WHEREAS, the City of Mounds View Municipal Code, Section 1006.06, Subd 3 <br />(Development Plan) requires a review of plans for utility service, surface water drainage <br />consistent with the most recently adopted Local Surface Water Management Plan subject to <br />subsequent revisions, erosion and sediment control consistent with current City standards, <br />streets, driveways, trails, parking, landscaping, screening and buffering, lighting, setbacks, <br />exterior construction design and materials, trash disposal, construction timetable and such other <br />matters as the Council may require; and, <br />WHEREAS, the City of Mounds View Planning Commission has reviewed the <br />documents listed below, finding them to be consistent with Section 1006.06, and other applicable <br />sections of the Mounds View Municipal Code: <br />Staff Report, dated June 7, 2017 <br />Applicant's Narrative, date stamped May 22, 2017 <br />Civil plans, p. 1 (Schultz Engineering & Site Design), dated May 4, 2017 <br />Site Plan, p. PIl (Outsource Architecture), date stamped May 30, 2017 <br />Architectural plans, p. A2.1, A3.1 (Outsource Architecture), dated May 12, 2017 <br />