My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2000-2009
>
2003
>
2003 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 11:08:57 AM
Creation date
8/29/2018 5:48:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
____ �-. - . s— �. _ =� � _ . -� � <br />Mounds View Planning Commission <br />Regular Meeting <br />November 5, 2003 <br />Page 3 <br />Director Ericson indicated that the other issue relating to the subdivision is traffic and Ramsey <br />County has a copy of the plat and is are concerned with the added driveways onto Silver Lal�e <br />Road but they have no power to deny the request. He then suggested it may be possible to share <br />driveways in some fashion to reduce the number of driveways coming out onto Silver Lalce <br />Road. <br />Director Ericson indicated that the utilities would need to be brought across Silver Lake Road <br />with either 7 cuts or ruruling one main and branching services off of it. He then said that there <br />are water issues on the east side of Silver Lake Road to deal with. <br />Director Ericson indicated that two residents had provided the City with a letter concerning the <br />subdivision and summarized the content of the letters by stating that both residents are opposed <br />to the subdivision. <br />Director Ericson indicated that the request is consistent with the Comprehensive Plan but noted <br />there is a policy that caution should be exercised when developing on environmentally sensitive <br />lands. <br />Director Ericson indicated that if the site is developed with the 15 lots all of the tree cover will <br />be removed and a substantial amount of grading would be required to bring the building <br />locations to the minimum recommended building elevation. <br />Commissioner Miller asked at w�iat point Rice Creelc would be involved, before or after the <br />Commission makes its recommendation. <br />Director Ericson indicated that Rice Creek becoines involved when the application is submitted <br />and that can be done before City approval or City approval would be contingent upon Rice Creek <br />approval. He then indicated this matter�would be bacic before the Planning Commission at its <br />next meeting. <br />Commissioner Zwirn asked whether there would be an elevation problem with Silver Lalce Road <br />because there is going to be a need to bring in additional soil and talce out the loamy soil to malce <br />it buildable. <br />Director Ericson indicated the drainage ditch would need to be maintained. He then said that he <br />expects there would be driveways built up with culverts underneath. He further indicated that <br />Staff would recommend that no fill be done within the right of way and that the existing right of <br />way be maintained with the exception of the driveways. <br />Chair Stevenson opened the public hearing at 7:20 p.m. <br />Martin Harstad addressed the Commission and said he felt it would be appropriate to bring <br />everyone up to date on the history of this property. <br />;,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.