My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2000/02/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2000
>
Agenda Packets - 2000/02/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:28 PM
Creation date
8/29/2018 2:47:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/14/2000
Supplemental fields
City Council Document Type
City Council Packets
Date
2/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> <br /> ORDINANCE NO. 654 <br /> <br /> CITY OF MOUNDS VIEW <br /> COUNTY OF RAMSEY <br /> STATE OF MINNESOTA <br /> <br /> <br />AN ORDINANCE AMENDING CHAPTER 202, SECTION 202.09 OF THE MOUNDS <br />VIEW MUNICIPAL CODE ENTITLED "PUBLIC IMPROVEMENTS" <br /> <br /> The City of Mounds View ordains: <br /> <br />SECTION I Chapter 202.09,Subd 2 of the Mounds View Municipal Code is <br />amended to read: <br /> <br />The following are methods of street reconstruction and rehabilitation, which will <br />be utilized by the City of Mounds View in considering future projects and <br />assessments. It will be noted that the design standard for either reconstruction or <br />rehab will be the current design of the street section. Projects may be constructed <br />to higher designs if warranted and / or approved by the City Council. <br /> <br />Subd.2 Improvement Type and Apportionment of Cost: <br /> <br />a. Street Reconstruction Including Curb and Gutter. The cost of street <br />reconstruction shall be recovered by the adjusted front footage method. <br />The front footage rate shall be determined by dividing the project cost by <br />the total number of adjusted front feet in the project area x the The <br />assessments per adjusted front foot may vary individual adjusted front <br />footage x one-half (2). depending on the underlying zoning of a parcel. <br />Assessments for residential properties which are on collector or arterial <br />streets, (MSA, County road) shall be assessed for one hundred (100%) of <br />the pavement surface and base, up to a width of 26 feet, equally divided by <br />both sides of the street. This amount shall not exceed $14.60 per front <br />foot. shall be adjusted so that the amount of the assessment shall be the <br />same as if the project were constructed to residential street standards. <br />b. <br />a.1. Non-Collector Street Residential property owners <br />will be assessed for the cost of the pavement and base <br />for the front footage side of the property, which <br />shall not exceed $14.60 per frontage foot. This amount <br />will be adjusted annually by resolution, in accordance <br />with the Engineering News <br />Record (ENR) <br /> a.2. Residents requesting Curb and Gutter, any
The URL can be used to link to this page
Your browser does not support the video tag.