Laserfiche WebLink
4931 W. 35TH ST. SUITE 200ST. LOUIS PARK, MN 55416CivilSiteGroup.comMatt Pavek Pat Sarver763-213-3944 952-250-2003COPYRIGHT 2013 CIVIL SITE GROUP INC.cISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION6/13/17CITY SUBMITTAL07/13/17CITY RESUBMITTAL......................BOULEVARD <br />2865-2901 MOUNDS VIEW BLVD / 7980 GROVELAND RD <br />7645 LYNDALE AVE SOUTH <br />MINNEAPOLIS, MN 55423 <br />MWF PROPERTIES <br />PROJECT <br />44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.07/13/17REVISION SUMMARYDATEDESCRIPTIONC5.1CIVIL DETAILS............18"MIN.12"112"27"112"16" O.C.STEPS ON DOWNSTREAM SIDECOVER SHALL BE STAMPED"SANITARY SEWER"BASES SHALL BE 8" STANDARD PRECAST WITH 2" LEAN GROUT, OR POURED 8" SLAB REINFORCED WITH 6" x6" 10/10 MESHPRECAST CONCRETE CONE SECTIONMETAL SEWER CASTING - REFER TOSTRUCTURE SCHEDULE FOR TYPEMIN. 2 AND MAX. 5 ADJUSTING RINGS.GROUT BETWEEN RINGS, CASTING,AND ALONG OUTSIDE.316"VARIABLE1'- 8" MAX.CLSLOPE AT 2 IN./FT. (TYP)FLOWRUBBER BOOTFLOWRUBBERBOOTRUBBER GASKET - TYPAT ALL JOINTSGROUT TO 1/2 PIPESLOPE @ 2 IN./FT.(TYP)SANITARY SEWER MANHOLEN T S1VARIES - TYP. 4'FLOWFLOW61"RIM ELEVATION"PRECAST COVER -8" THICKSTEPS - INSTALL ONDOWNSTREAM SIDE@ 16" O.C.PRECAST CONCRETESECTIONGROUT SHELF ANDCHANNELSMETAL SEWER CASTING -REFER TO STRUCTURESCHEDULE FOR TYPEMIN. 2 AND MAX. 5 ADJUSTINGRINGS. GROUT BETWEENRINGS, CASTING, AND ALONGOUTSIDE.STORM SEWER PIPE - SEEUTILITY PLAN FOR LOCATION,INVERT, AND SIZESBASES SHALL BE 8" STANDARDPRECAST WITH 2" LEAN GROUT, ORPOURED 8" SLAB REINFORCED WITH6" x 6" 10/10 MESHRUBBER GASKET -TYP AT ALL JOINTSCATCH BASINN T SDIMENSIONS FROM BACK OF CURB(BOC) TO CENTER OF PIPE:4' DIA. MH - 9" IN FROM BOC5' DIA. MH - 3" IN FROM BOC6' DIA. MH - 3" BEHIND BOC7' DIA. MH - 9" BEHIND BOC8' DIA. MH - 15" BEHIND BOC2MIN. 2 AND MAX. 5 ADJUSTING RINGS.GROUT BETWEEN RINGS, CASTING, ANDALONG OUTSIDE.METAL SEWER CASTING - REFER TOSTRUCTURE SCHEDULE FOR TYPEPRECAST CONCRETE CONE SECTIONBASES SHALL BE 8" STANDARD PRECASTWITH 2" LEAN GROUT, OR POURED 8"SLAB REINFORCED WITH 6" x 6" 10/10MESHCOVER SHALL BE STAMPED"STORM SEWER"STEPS ON DOWNSTREAM SIDEGROUT SHELF AND CHANNELS16" O.C.VARIABLE27"112"VARIABLE 18"MIN.STORM MANHOLEN T SDIMENSIONS FROM BACK OF CURB(BOC) TO CENTER OF PIPE:4' DIA. MH - 9" IN FROM BOC5' DIA. MH - 3" IN FROM BOC6' DIA. MH - 3" BEHIND BOC7' DIA. MH - 9" BEHIND BOC8' DIA. MH - 15" BEHIND BOC3PIPE BEDDING - RCP & DIPN T S4PIPE BEDDING - PVCN T S5CATCH BASIN/MANHOLE/RISERREMARKSCASTING SCHEDULENOTE:1.CASTINGS SHALL BE NEENAH FOUNDRY CASTINGS OR APPROVED EQUIVALENT.2.CASTINGS SHALL BE STAMPED WITH APPROPRIATE UTILITY NAME ("STORM SEWER", "SANITARY SEWER")CASTING SCHEDULEN T SGRATE TYPE(NEENAH)STORM CURB INLETR-306713, 16, 226STORM AREA DRAIN INLETR-25012, 14, 15STORM MANHOLER-164212, 32-34D24"3H:1L MAX.BIO-INFILTRATION BASIN (RAIN GARDEN - TYP.)N T STYPICAL SECTION VIEW1.INSTALL SILT FENCE AND/OR OR OTHER APPROPRIATE TEMPORARY EROSION CONTROL DEVICES TOPREVENT SEDIMENT FROM LEAVING OR ENTERING THE PRACTICE DURING CONSTRUCTION.2.ALL DOWN-GRADIENT PERIMETER SEDIMENT CONTROL BMP'S MUST BE IN PLACE BEFORE ANY UP GRADIENTLAND DISTURBING ACTIVITY BEGINS.3.PERFORM CONTINUOUS INSPECTIONS OF EROSION CONTROL PRACTICES.4.INSTALL UTILITIES (WATER, SANITARY SEWER, ELECTRIC, PHONE, FIBER OPTIC, ETC) PRIOR TO SETTING FINALGRADE OF BIORETENTION DEVICE.5.ROUGH GRADE THE SITE. IF BIORETENTION AREAS ARE BEING USED AS TEMPORARY SEDIMENT BASINSLEAVE A MINIMUM OF 3 FEET OF COVER OVER THE PRACTICE TO PROTECT THE UNDERLYING SOILS FROMCLOGGING.6.PERFORM ALL OTHER SITE IMPROVEMENTS.7.PLANT ALL AREAS AFTER DISTURBANCE.8.CONSTRUCT BIORETENTION DEVICE UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA.9.IMPLEMENT TEMPORARY AND PERMANENT EROSION CONTROL PRACTICES.10.PLANT AND/OR ROCK MULCH BIORETENTION DEVICE.11.REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE CONTRIBUTING DRAINAGE AREA ISADEQUATELY VEGETATED.GENERAL NOTES1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY FOLLOWINGEXCAVATION, THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR TO CONTINUINGCONSTRUCTION.2.GRADING OF BIORETENTION DEVICES SHALL BE ACCOMPLISHED USING LOW-COMPACTION EARTH-MOVINGEQUIPMENT TO PREVENT COMPACTION OF UNDERLYING SOILS.3.ALL SUB MATERIALS BELOW THE SPECIFIED BIORETENTION DEPTH (ELEVATION) SHALL BE UNDISTURBED,UNLESS OTHERWISE NOTED.CONSTRUCTION SEQUENCINGRIBBON CURB OR CURB CUT, SEESITE AND GRADING PLANSGRASS PRE-TREATMENT STRIP ORPRE-TREATMENT STRUCTURE, SEEUTILITY AND LANDSCAPE PLANSUNDISTURBED, UNCOMPACTED INSITU SOILNET LESS EROSION BLANKET IN BOTTOM OFBASIN. SLIT BLANKET TO ALLOW PLANTMATERIAL SURFACE IF PLUG PLANTING IS TOBE USED, SEE GRADING AND LANDSCAPEPLANSMIN.PLANTING MEDIUM DEPTH 24"WITH A WELL BLENDED MIXTURE (BY VOLUME):70% HOMOGENOUS CONSTRUCTION SAND30% ORGANIC COMPOSTSEE GRADING PLAN FOR DEPTHPLANT MATERIAL, SEE LANDSCAPE PLANSIDE SLOPE TREATMENTS, SEE GRADING OR LANDSCAPE PLANSMUST OVER EXCAVATE DOWNTO SUITABLE SOILS. FIELDVERIFY WITH SOILS ENGINEER7SANITARY MANHOLER-1642ADOWNSPOUT TO PIPE CONNECTIONN T SVARIES <br />BUILDING DOWNSPOUTREFER TO ARCH'LCAP WITH HOLE CUT OUTFOR DOWNSPOUTCOMPACTED SOIL6" PVC SEWER RISER PIPE(LENGTH AS REQUIRED)6 PVC LONG RADIUS 14BEND SEWER ELBOW6" PVC SEWER PIPECRUSHED ANDCOMPACTED STONE8