My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-05-2013
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2010-2019
>
2013
>
06-05-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:33:51 AM
Creation date
8/30/2018 7:25:17 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
6/5/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1120.04 1120.04 (Rev. 5/10) <br /> <br /> <br /> (5) The architectural design of the project is compatible with the surrounding area. <br /> <br /> (6) The drainage and utility system plans are submitted to and subject to the approval of the <br />Director of Public Works/City Engineer. <br /> <br /> (7) The development schedule insures a logical development of the site which will protect the <br />public interest and conserve land. <br /> <br /> (8) The development is in compliance with the requirements of Chapter 1010 and Titles 1200 <br />and 1300 of this Code. <br /> <br /> (9) Dwelling unit and accessory use requirements are in compliance with the district provisions <br />in which the development is planned. <br /> <br />Subd. 4. Final Plan: <br /> <br /> a. Purpose: The final plan is to serve as a complete, thorough and permanent public record of the PUD <br />and the manner in which it is to be developed. It shall incorporate all prior approved plans and all <br />approved modifications thereof resulting from the PUD process. It shall serve in conjunction with <br />other City ordinances as the land use regulation applicable to the PUD. <br /> <br /> b. Submission of the Final Plan: Upon approval of the development stage plan, the applicant shall file <br />with the City Administrator a final plan consisting of the information and submissions required by <br />subdivision 1120.05(3), Final Plan Stage, of this Chapter for the entire PUD or for one (1) or more <br />stages. The final plan is intended only to add detail to and to put in final form the information <br />contained in the general concept plan and the development stage plan and shall conform to the <br />development stage plan in all respects. (Amended, Ord. 844, 5-20-10) <br /> <br /> c. Review of Final Plan: The Director of Public Works/City Engineer shall review the final plans to <br />assure their compliance with the general concept and development stage plans and shall require <br />appropriate revisions by the applicant wherever they do not so comply. The Director of Public <br />Works/City Engineer shall report the findings to the City Administrator who shall notify the applicant, <br />in writing, of approval of the final plan. (Amended, Ord. 844, 5-20-10) <br /> <br /> d. Recording of Final Plan: Within ten (10) days of the City Administrator's notice of approval, the <br />applicant shall cause the final plan, or such portions thereof as are appropriate, to be recorded with the <br />County Register of Deeds or Register of Titles. (Amended, Ord. 844, 5-20-10) <br /> <br /> e. Building and Other Permits: Upon receiving notice from the City Administrator that the approved <br />final plan has been recorded and upon appropriate application of the applicant, building and other <br />permits may be issued to the applicant for development, construction and other work in the area <br />encompassed by the approved final plan; provided, however, that no such permit shall be issued unless <br />the requirements of all applicable codes and ordinances have been satisfied. (Amended, Ord. 844, 5- <br />20-10)
The URL can be used to link to this page
Your browser does not support the video tag.