Laserfiche WebLink
Item No: 5A <br />Meeting Date: April 18, 2007 <br />Type of Business: Action <br /> <br />City of Mounds View Staff Report <br /> <br />To: Mounds View Planning Commission <br />From: Heidi Heller, Planning Associate <br />Item Title/Subject: Development Review for an additional building at <br />Central Sandblasting, 2299 County Road H; <br /> Planning Case DE2007-002 <br /> <br /> <br />Introduction: <br /> <br />Central Sandblasting, represented by Matt Herbst, located at 2299 County Road H, is <br />requesting a development review for a new approximately 11,000 square foot building to be <br />built on the west side of their property. This expansion would increase the total building <br />square footage by approximately 60 percent. Central Sandblasting and Herbst & Sons <br />Construction Company both operate at this site and are owned and operated by the Herbst <br />family. This expansion would help the company continue to be competitive in their market <br />and be able to handle more projects at one time. <br /> <br />Discussion: <br /> <br />The Central Sandblasting property is 2.87 acres and zoned I-1, Industrial. They do abrasive <br />blasting and specialize in the application of protective coatings and industrial coatings for <br />structural steel. They have been in business since 1967, and in the same Mounds View <br />location since 1973. They currently have about 25 employees, and plan to add another five <br />to six employees with this expansion. The new building would be the same steel construction <br />as their current building. They have recently been working to clean up the yard space and <br />will continue to do so in preparation for construction. <br /> <br />Parking <br />According to the City’s parking code requirements, a manufacturing facility would be required <br />to provide parking according to the following schedule: At least eight spaces plus one space <br />for each two employees on each shift based on maximum planned employment or, at a <br />minimum, at least eight spaces plus one space for each five hundred square feet of floor <br />space. The current building size requires 45 parking spaces, and with the expansion, this <br />number would increase to 67 spaces. <br /> <br />The property is almost entirely either a gravel or asphalt surface, which allows an ample <br />amount of available parking space. There are only a few designated parking spaces in the <br />front of the current building, and the rest of the yard area is surfaced primarily with gravel. <br />Most employees park inside the fenced yard area facing County Road H. The new building <br />will have some additional asphalt around it, with several additional designated parking <br />spaces in the front. Staff is confident that the site can support the building expansion in <br />regards to parking, since parking is available almost anywhere on the site. <br />