My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-01-2006
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2000-2009
>
2006
>
02-01-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:15:11 AM
Creation date
8/30/2018 9:57:04 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
2/1/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A-2 <br />Proposed Project Description <br />S The Project Master Site Plan, after all Phases, envisions the potential for a 1.5 million square foot <br />campus in Mounds View that is designed for up to 6,000+ employees. <br />S The company envisions a 72 acre campus, surrounded by various walking/biking paths, ponds, <br />natural wetlands and trees. <br />S Phase I of the project includes the construction of a building complex totaling 820,000 sq. ft. of office <br />space. The Phase I complex would be designed for approximately 3,300 employees, with surface <br />parking for about 3,400 vehicles. <br />S Potential later phases of the project would likely include construction of two more buildings totaling <br />680,000 sq. ft of office space. The Phase II/III complex could be designed for about 2,700 <br />employees. <br />S Later phases are projected to be completed in 2012 and 2017 respectively and may involve structured <br />and surface parking for vehicles. <br />Transportation <br />S The Bridges AUAR, authorized by the City, reviewed all transportation issues related to the proposed <br />development of the site. RLK-Kuusisto of Minnetonka prepared the AUAR documents. <br />S The Traffic Study, paid for by Medtronic, reviewed traffic forecasts and capacity analysis of the <br />roads to be used by Medtronic employees. The Study indicated that a significant portion of the <br />additional daily trips on the roads are being caused by adjacent development in Blaine and <br />Shoreview. <br />S The Medtronic corporate campus will be designed to maximize the flow of traffic into and out of the <br />facility and bordering freeways. <br />S On April 11, 2005 Gov. Pawlenty signed the State's Bonding bill that includes appropriations for road <br />improvements necessary for the Medtronic project. The budget included $20.5 million intended for <br />various improvements, including Airport Road, Co. Rd. J, Xylite St., Coral Sea St., Interstate 35W <br />and Naples St. It will improve the current traffic situation and as well as accommodate additional <br />capacity. <br />S Because of the Medtronic project, County Road J & I-35W Bridge would be reconstructed by 2008. <br />These infrastructure improvements are occurring 20+ years ahead of when they otherwise would be <br />scheduled. <br />(As Modified February 13, 2006) <br />Due to various market conditions, Medtronic, Inc. has decided to proceed with Phase II of the <br />anticipated project. Phase II consists of the construction of an additional 380,000 sq. ft. of office space. <br />The total project, therefore, will consist of 1,200,000 sq. ft. of office space. In addition, the surface <br />parking plan is being replaced with a 4,200 vehicle parking ramp. The Phase II complex would be <br />designed for approximately 1,400 employees bringing the potential employees in the Mounds View <br />campus to 4,320.
The URL can be used to link to this page
Your browser does not support the video tag.