Laserfiche WebLink
Mounds View Planning Commission June 7, 2006 <br />Regular Meeting Page 16 <br />________________________________________________________________________ <br /> <br />E. DE2006-002. Development Review for an Expansion to Midwest Motor <br />Express building, Midwest Motor Express. <br /> <br />Planning Associate Heller informed the Commission that the applicant and property owner of <br />Midwest Motor Express is requesting a development review for a proposed 10,500 square foot <br />building addition to be added onto the north side of the existing building at 2169 Mustang Drive. <br />This expansion would help the company continue to be competitive in their market and streamline <br />their current processes. Midwest Motor Express provides direct trucking services to 13 states in <br />the Midwest and western United States. <br /> <br />The Midwest Motor Express property is zoned Industrial with motor freight terminals being <br />allowed as a conditional use. With the expansion, they expect to hire about eight to ten new <br />employees consisting of drivers, dockworkers and office personnel. The building was constructed <br />in 1974 as a trucking terminal, and was expanded once in 1994 by 3,500 square feet along with <br />surfacing approximately 90,000 square feet. <br /> <br />The building is currently 19,000 square feet and the site also includes a 3-bay repair garage on the <br />west side of the building. Midwest Motor Express would like to add a 70’x150’ expansion to the <br />north end of the building. This expansion would consist of warehouse space and an additional 24- <br />dock doors (12 on each side of the building). They are not expanding the building in anticipation <br />of additional business, instead, they want to perform their dock operations more efficiently and <br />productively. Additional truck traffic after the expansion is not anticipated. <br /> <br />This property is zoned Industrial and is just over eight acres in size. The Comprehensive Plan <br />designates the current and future land use specifically as “Heavy Industrial.” <br /> <br />According to the City’s parking code requirements, this facility would be required to provide <br />parking according to the following schedule: at least eight spaces plus one space for each two <br />employees on each shift based on maximum planned employment; or at a minimum, at least eight <br />spaces plus one space for each five hundred square feet of floor space. At maximum expansion, <br />this would result in the need to provide a total of 67 parking stalls when based on the total square <br />footage of the building. There are currently about 40 marked parking spaces in the front of the <br />building. More than enough space for parking exists at this facility since much of the site is paved. <br />Staff is confident the site can support any parking needed. <br /> <br />Planning Associate Heller advised that none of the setbacks would be changing except the rear of <br />the building would be moved to within 225 feet of the north property line. This setback is much <br />greater than the minimum requirement in an industrial district of 40 feet when abutting a <br />residential area. Townsedge Manufactured Home Park abuts Midwest Motor Express on the north <br />side. There is a grassy area with a berm and trees at the north end of the property separating <br />Midwest Motor Express’ property from Townsedge. Staff feels that a building setback of 225 feet <br />plus the vegetative separation between the properties should be an adequate buffer for the <br />residential area. <br />