Laserfiche WebLink
Medtronic PUD General Concept Plan Report <br />August 3, 2005 <br />Page 2 <br /> <br />The concept plan is intentionally general; the buildings will not be constructed as simple <br />rectangles as shown but something with more of an architectural design appeal. The <br />rectangles are intended to show the general location and building massing. Similarly, the <br />creek that runs through the property south of the buildings will not be relocated in 90 degree <br />angled segments but rather more of a meandering, natural flowing channel. All of the <br />buildings will be erected with the Mounds View city limits although some parking and <br />potentially a parking structure could be constructed on the land within the City of Blaine. <br /> <br />First phase will involve construction of a combination of surface parking and structured <br />parking stalls totaling approximately 3,000 spaces. The second and third phases will add two <br />more buildings for a total 1,500,000 square feet of floor area. Phase two would add two more <br />levels to the parking ramp constructed in Phase 1, and Phase 3 would add four levels of <br />structured parking in the City of Blaine. The plan shows a total of 6,000 surface and <br />structured parking stalls at full build-out. <br /> <br />Municipal Coordination: <br /> <br />City staff from Blaine and Mounds View met on July 26, 2005 to informally review and <br />coordinate the processes for site plan review and other issues related to this development. <br />Blaine staff was supportive of the project and expressed a desire to be helpful in any way <br />possible. It was discussed that the Medtronic campus could potentially be served by Blaine <br />water for fire protection as a back-up and supplement to Mounds View water which will be <br />brought to the site from under Highway 10. Blaine staff would like to have the site plans and <br />phasing schedule presented to the Blaine City Council in September for consideration. Site <br />plan approval from Blaine will likely be an administrative step. Another meeting will be <br />scheduled upon receipt of the more detailed development stage plans. <br /> <br />Recommendation: <br /> <br />Hold the public hearing and take testimony from staff, the applicant and any residents or other <br />interested parties relating to the general concept plan. Given the informal support expressed <br />at the July 20, 2005 Planning Commission meeting, staff has prepared a resolution <br />recommending approval of the general concept plans for an 820,000 square foot office facility <br />at 8290 Coral Sea Street. <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br /> <br />Jim Ericson <br />Community Development Director <br /> <br />Attachments: <br />1. Application <br />2. Zoning Map <br />3. Concept Plan Submittal Information <br />4. City Code Chapter 1120 <br />5. Resolution 807-05 <br />