Laserfiche WebLink
Belting Report <br />September 21, 2005 <br />Page 3 <br /> <br />Lighting: The lighting plan is being prepared and was unavailable at the time this report was <br />drafted. The applicant has been informed of the City’s minimum requirements regarding <br />glare, light spillage and foot-candle readings. In addition to the detailed photometric analysis, <br />the applicant will need to submit detailed specifications for all freestanding and wall-mounted <br />exterior lighting along with pole heights. While the site does not border on residential <br />property, it is adjacent to the Community Center and across the street from City Hall and <br />effort must be taken to not over illuminate the site. <br /> <br />Stormwater Management: The site was master graded during the construction of the <br />Walgreens building and a large stormwater pond installed southeast of the site. There is an <br />existing storm sewer designed to serve both properties. The applicant plans to tie into the <br />stormsewer as shown on the grading, drainage, erosion control and utility plan. The runoff <br />from the parking lot will sheet flow to one of two new catch basins which will direct the runoff <br />to the existing stormsewer which ultimately flows to the large stormwater pond to the <br />southeast. Run off from the building and grounds surrounding the building will flow to the <br />east and be captured in a swale that runs the length of the rear of the building. The swale <br />outlet is located at the southeast corner of the site three feet below the finished floor <br />elevation of the building. The grading and drainage plans are being reviewed by the City’s <br />consulting engineer for compliance with the City’s local water management plan. <br /> <br />Easements: An easement originally platted with the Mounds View City Hall Addition will need <br />to be vacated as a result of this plan. The easement had been taken assuming a different lot <br />utilization. A new easement would be taken in its place. The triangular easement to be <br />vacated is identified on the Sheet C1 of the submittal plans entitled Preliminary grading, <br />drainage, erosion control & utility plan, at the northeast corner of the parcel. The applicant’s <br />engineer has prepared the legal descriptions for the easement to be vacated along with the <br />description of the easement to be acquired. <br /> <br />Development Review Summary: <br /> <br />The proposed office use on the undeveloped parcel would be consistent with the City’s Zoning <br />Code and Comp Plan and would bring development and tax base to the site. There would not <br />be a great deal of traffic generated by this particular use, so the impact to the area would be <br />minimal. A development agreement will need to be executed with the applicant to ensure all <br />of the specific requirements and conditions of development are satisfied and adhered to. <br /> <br />Recommendation: <br /> <br />Resolution 817-05 is attached to this report which recommends approval of a development <br />review for the proposed 8,300 square foot single store office building at 2395 County Road <br />10. <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br /> <br />James Ericson <br />Community Development Director