My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-2005
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2000-2009
>
2005
>
10-19-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 6:11:48 AM
Creation date
9/4/2018 6:05:26 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
10/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View Planning Commission October 5, 2005 <br />Regular Meeting Page 3 <br />________________________________________________________________________ <br /> <br />Commissioner Hegland asked for confirmation that the comp plan is what the Commission is <br />gauging projects on. He noted his prior question was if the TIF a plan was in compliance with <br />the comp plan, because they did not have that information. Mr. Riggs replied that the TIF plan <br />and the project it would support would be consistent with comp plan, reiterating that the <br />Commission is not involved in any budgetary of the City. <br /> <br />Commissioner Stevenson thanked Mr. Riggs for clarifying a few issues. <br /> <br />Commissioner Miller stated the handouts are very helpful. Mr. Riggs replied that was the intent. <br />He added he is open to questions in the future. <br />______________________________________________________________________________ <br /> <br />6. Planning Cases MA2005-002 and PD2005-002. Consideration of a Preliminary Plat <br />Review, Rezoning and Development Stage Plan Review Associated with the <br />Medtronic CRM Project. <br /> <br />Commissioner Stevenson asked for clarification regarding the fact that one resolution was <br />drafted for several items. He added that while each item is clearly broken down within the <br />resolution, usually there are separate resolutions. Director Ericson replied that in the past <br />different actions have been presented in separate resolutions; however, for this one it is not <br />necessary because the Commission would be recommending approval or denial to Council as a <br />whole. <br /> <br />Commissioner Stevenson asked for a general consensus from the commission on the grouping of <br />the actions into one Resolution and, upon receiving, stated the items will be acted on together. <br /> <br />Community Development Director Ericson reviewed the staff report indicating the applicant, <br />Medtronic, Inc., is requesting approval of the preliminary plat and development stage plans of <br />the Medtronic PUD. The approved development, which has not changed, is a multi-phased <br />project totaling 1,500,000 square feet in four connected, east-west oriented buildings. He <br />reviewed the three different phases in terms of buildings, parking, and square footage. <br /> <br />Director Ericson referenced the PUD noting only one wetland in the project area will be <br />impacted. The judicial ditch will be realigned away from the building to alongside Highway 10 <br />in a wider, more natural, meandering channel. Two new stormwater ponds will be created and <br />an existing pond expanded to accommodate the run off on site. <br /> <br />Director Ericson referenced the preliminary plat noting there are four lots, an outlot, and a <br />possible sixth lot which would encompass the first phase parking ramp north of the phase 1 <br />buildings. The City must consider a rezoning of the project area from the existing Light <br />Industrial (l-1) designation to Planned Unit Development (PUD), which would be consistent with <br />the comp plan. <br /> <br />Director Ericson stated there are no compelling adverse effects associated with this project. He <br />requested the Planning Commission review and consider the development stage plan, the CRM
The URL can be used to link to this page
Your browser does not support the video tag.