Hidden Hollow Planning Commission Report <br />April 21, 2004 <br />Page 2 <br /> <br />Drainage Plan: Page C2 of the submittals illustrates in detail the grading, drainage and <br />erosion control of the development. The lots are shown to be graded in such a way as to allow <br />swaled stormwater run-off from the north to south, with runoff collecting at the south end <br />draining to the east to an infiltration pond. Because the street will have curb and gutter, there <br />are stormsewer catch basins that would accept all runoff from streets and driveways, piping <br />the runoff to the existing pond adjacent to County Road H2. (The existing pond will be <br />increased in size to handle the additional volume.) The combination of the ponds and swales <br />will capture all of the runoff generated from the site. Ultimately, whatever stormwater that does <br />not infiltrate into the ground will enter an existing storm sewer system that exits the <br />development area at the southeast corner of the site. <br /> <br />Easements: The City’s Subdivision Code requires that plats dedicate perimeter drainage and <br />utility easements for each lot in the subdivision, and dedicate easements for all wetlands, <br />stormwater holding ponds and interior drainageways associated with the development. This <br />plat does dedicate the necessary perimeter, ponding and wetland easements. There are <br />numerous existing easement areas covering old utilities that would need to be vacated by this <br />plat and are so designated. <br /> <br />Streets: The Public Works Director and his staff have reviewed the street plan (as well as all <br />aspects of the utilities and infrastructure) and have concluded that the proposed dedicated <br />right of way is adequate to suit the City’s needs. The right of way would be sixty feet wide and <br />the street width (the paved area) would be approximately 32 feet from curb to curb. There is <br />an existing right of way dedicated for Pleasant View Drive on the western edge of the plat that <br />is marked “to be vacated”. The Public Works Director has required that the right of way remain <br />dedicated and the lots will need to be pulled back as a result. The desire to keep the right of <br />way is to protect the utilities that are already present in this area and to preserve the City’s <br />ability to maintain the utilities without worry of fences, delineating landscaping, sheds, fences <br />and other impediments to future access. <br /> <br />Park Dedication Requirements: The Subdivision Code indicates that any subdivision of land is <br />subject to a park dedication fee. In this case, the fee is equal to 10% of the market value of <br />the land. Because of the difficulty in establishing what the market value is, staff uses Ramsey <br />County assessed values as the basis for dedication computation. Using the property recently <br />acquired by the City from the County as the benchmark, it was determined that existing land <br />values were about $1.00 per square foot. The development area comprises 407,674 square <br />feet for a total land value of $407,674. The dedication amount then would be $40,764. This <br />amount has been communicated to the developer however it could end up being more or less <br />depending upon how the Council defines the project area. <br /> <br />Utilities: All utilities on the site would need to be installed underground, per Section 1203.10. <br />Water and sanitary sewer stubs are shown on the plans on Page C3. This page also shows <br />the storm sewer piping that would be constructed on the site. Four fire hydrants are shown on <br />the plan consistent with Fire Department spacing recommendations. The utilities and the <br />street would be installed as a public project paid by special assessment levied against each of <br />the seventeen parcels. <br />